Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

6 Pages<12345>»
Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline 1borna  
#101 Posted : 15 February 2018 21:38:35(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Mr. Matočec works well on most of the roads with wireless power
UserPostedImageUserPostedImage
UserPostedImageUserPostedImageUserPostedImage
There is always a new composition on the layout
UserPostedImage
The loading ramp is over, the final paint is still waiting
UserPostedImage
The work desk is again buried (in bad habit)
UserPostedImage
The models are waiting for the test drive before the release
UserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#102 Posted : 28 February 2018 21:08:13(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImage
There was a video locomotive
UserPostedImage
so it should be connected to control over the tablet
UserPostedImageUserPostedImageUserPostedImage
[YOUTUBE]https://lh3.googleusercontent.com/M1KS33qpwNTENKlYmTMS0Fcj2MoXc_bAu9k_XRFybtzc478c5XAXGmD5-1D1AFAVNSPnajrpSIPme1uufrFGDzSpGAxexQVX9yG2OKoIMTudIgBqxxGTOcf3EqIB8TMiYAhXLw-485QhlIuBLqheZOnHtGMPRH6Q88V9eNjL_9Pm5vCRqIFkkdVNyYKdJaTpX9wfMswWLnNwdStNxzCvD2_GRzeAjuZh7zXlh9vjaOAbus9lo7j3dQM4BJZmRM5OSYS0HQs-EduMB-oEYNMzhR53i5YOh8h6LUmpXLKdINmDxJB2UVe697864rWZPd-jtqXz-M-jXe6qDBRtSEHZHBDFLvA3d65hFkm1GiNxK30ofJQygK7jf84nworzx4XQ5q5PhWTTaNKsdXjF6hc722aBhly4_vxDm6sM0rZcmnDBWwun5OMRAZlRk2U6jl_jpAMWea29S9vwlexTC_sqc2ym6Yn6NGcNlErLCyQLH8p7U0WJEeyrwybbElBUpYkc_z-iQbdbf6xizoojyeBS-Cv6BQykWl7D29tfEz3qr4AOPzJpcrz3GH1HMsr5opxl3SA1iS3t3RIy7hABQLtOgjQA0dskf5Y-qPo1e-6AECmFDmzeV_fbruxycZa4rcK3FZQ0TT7nSbcQJRia4Wjr8J7T9e0qDKshYw=w783-h589-no[/YOUTUBE]
thanks 3 users liked this useful post by 1borna
Offline 1borna  
#103 Posted : 14 March 2018 21:34:09(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Since visitors know how to bring different locomotives to repair, Backo has decided to create a testing table that can serve multiple systems
UserPostedImageOne multipole switch selects the system and another power sourceUserPostedImage
Here is also a decoder tester that can accept all types of decoders
UserPostedImage
UserPostedImageUserPostedImage
Since the snow has fallen recently, there are 2 special snow-plowing vehicles
UserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 3 users liked this useful post by 1borna
Offline 1borna  
#104 Posted : 21 March 2018 21:05:04(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
The test module is extremely advanced. There is even a test for lighting in wagons via Viessmann (or a modified Fleischmann pro)

ENTER:
- CS Marklin (CS3, CS2)
- IR Marklin center
- Z21 center
- Central DCC
- DC conveyors
- AC Kontoleri
- Z control

EXIT:
- H0 track - Marklin
- H0 rails - Roco
- H0 track - Rollenpruefstand
- TT track - Tillig
- N rail - Fleischmann
- Track Z - Marklin
- Tester MFX decoder
- Viessmann buckle tester
- Exit to connect other testers (eg ESU, etc.)

Types of testing
- Development of locomotives
- Driving
- Programming
- Sound and speed synchronization
- Testing the MFX decoder - sound, lighting, engine
- Programming IR Marklin addresses
- Testing the lighting in the wagon

/ It seems to me that this topic is no longer interesting, as if to write in vain?
thanks 2 users liked this useful post by 1borna
Offline 1borna  
#105 Posted : 31 May 2018 19:52:42(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Since several members of the forum asked me to continue here, the sequels (always find something interesting)
UserPostedImage
A large plate with wireless power and a lot of roads is ahead
UserPostedImage
Servo motors with magnets serve to stop the vehicle
UserPostedImage
It also has a lot of decoders for servo motors, busy parts of the road, for lighting ...
UserPostedImage
UserPostedImage
There are also more switches that can have up to 4 positions
UserPostedImageUserPostedImageUserPostedImage
A special machine was created for precision drilling of round or oval holes
UserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline Minok  
#106 Posted : 31 May 2018 20:21:55(UTC)
Minok

United States   
Joined: 15/10/2006(UTC)
Posts: 2,313
Location: Washington, Pacific Northwest
It would be really cool to have them write up and explain their inductive car powering circuits and technology.
I'd contacted the person you had mentioned but never heard back. Its a cool solution that probably would be interesting to use by some home modellers, not having to futz with battery charging.
Toys of tin and wood rule!
---
My Layout Thread on marklin-users.net: InterCity 1-3-4
My YouTube Channel:
https://youtube.com/@intercity134
Offline 1borna  
#107 Posted : 31 May 2018 20:54:34(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
I'm currently on the sea, but when I get back to Zagreb I'll talk to the chief engineer.
For now I can say that a high frequency of 82 KHz is selected and everything is rated at 34.5 volts (copper strips below the road)
UserPostedImage
On the underside of the vehicle there is a small conveyor in which a voltage is induced to start a small electric motor
UserPostedImage
UserPostedImage
The frequency is selected by experiments and must be equal to all parts of the road, which is aligned with many capacitors. The source of high-frequency power is self-construction
UserPostedImage
UserPostedImageUserPostedImage
Frequency and voltage on the road are measured with a specially made instrument
UserPostedImage
All in all is not that easy to make the whole system, but if a couple of modeling friends came together it would pay off?
thanks 2 users liked this useful post by 1borna
Offline 1borna  
#108 Posted : 05 June 2018 19:48:33(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
More from the official site of the layout https://www.backo.hr/en/
UserPostedImage

Our post from a year ago announced the development of a technology that supplies car models with induced current. Until today, in addition to models in St. Petersburg and one smaller model in Germany, no one in the world has developed anything like this (including the largest model in the world in Hamburg!), at this point there is no technical documentation nor instructions for implementation of the project. Therefore we had to start from the beginning and come to all solutions by ourselves. Of course, with the system of trial and error. And it lasted two years (one year for the development ideas, and another for the realization of the model). But it was worth it. Today our electrical cars run on the inducted current, and thanks to the applied technical innovations, in our model there are small personal electrical cars driving (on other models there are only trailer trucks and buses driving, since they use much more electronic circuits that do not fit in a small car). And when it was all over, we hired a professional institution to measure the intensity of radiation, to ensure that our solution is not harmful, for the health of our visitors, and employees who are frequently sneaking beneath the model. The test results were the “icing on the cake.” Radiation produced by induction is negligible, ie. Substantially lower than the most rigorous global standards, which is proven by all the necessary certificates.

And now, when we have a technical solution, we are left to the imagination and to enrich traffic with as much content. Some ideas are already in the implementation: police who control the speed by radar, vehicles that overtake, children crossing the road at the pedestrian crossing, parking lot with entry and exit ramps, garage for buses, and some will certainly, in time, still come to mind. Because our guiding principle is a “dynamic scale model” which has constantly a lot going on and thus draws the attention of visitors. And that is why we are unique!
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#109 Posted : 18 June 2018 21:08:38(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The vehicle storage compartment has a lift door
UserPostedImage
There are many alternatives here
UserPostedImageUserPostedImage
One door is formed
UserPostedImage
And she will be mobile
UserPostedImage
And this fire department has a movable door
UserPostedImage
Several pictures of beautiful details on the layout
UserPostedImageUserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#110 Posted : 07 July 2018 19:52:29(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The small market is full of tiny details
UserPostedImage
UserPostedImage
Here's the joy
UserPostedImageUserPostedImage
Easter was all over and there was lots of eggs everywhere
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#111 Posted : 16 July 2018 20:54:15(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The small layout of the road traffic is, after numerous probes, ready for decoration
UserPostedImage
Young Matej is in charge of it
UserPostedImage
Mr. Matočec, who agreed with the wireless power supply, checked the connections againUserPostedImage
As much as the layout looks small it is full of wire and electronics
https://lh3.googleusercontent.co...oZK7J2Gx_ow=w818-h613-no
It started with the making of sidewalks and then various details
UserPostedImage
UserPostedImageUserPostedImageUserPostedImage
UserPostedImage
thanks 4 users liked this useful post by 1borna
Offline dominator  
#112 Posted : 16 July 2018 23:26:28(UTC)
dominator

New Zealand   
Joined: 20/01/2015(UTC)
Posts: 1,199
Location: Kerikeri
WOW. An amazing idea. Cant wait to see it in action.

All the best.
Dereck
Northland. NZ REMEMBER 0228 for ä
thanks 1 user liked this useful post by dominator
Offline GlennM  
#113 Posted : 18 July 2018 01:05:17(UTC)
GlennM

United Kingdom   
Joined: 09/05/2011(UTC)
Posts: 2,919
Location: Somewhere, But Nowhere Near Manchester, England
Fantastic thread, very interesting to read and with lots of great pictures.

It is always very interesting to watch a layout being built, thank you for taking the time to post this thread and I hope you will continue to post updates as progress is made. ThumpUp ThumpUp
Don't look back, your not heading that way.
thanks 1 user liked this useful post by GlennM
Offline Legless  
#114 Posted : 18 July 2018 12:17:55(UTC)
Legless

Australia   
Joined: 20/07/2007(UTC)
Posts: 809
Location: Leopold, Victoria
What a great thread and an inspiration to me and other forum members.
Well done.
Mike
Legless
Era's 1 to 111,C track,k track
thanks 1 user liked this useful post by Legless
Offline 1borna  
#115 Posted : 18 July 2018 20:26:42(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Thanks for the nice words, it gives me the support to keep going!
This is why I am fulfilling the purpose of the forum to share experiences with inspiration and show inspiration.
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
This blue led in front transmits infrared commands to buses that are covered by the canopy at the station, will later be masked
UserPostedImage
The whole team usually meets on Monday morning and is discussing the job they are doing and posting new assignments
UserPostedImage
Later the layout itself and the arrangement of the performance, everyone has the right to express their opinions and ideas and then work best!
UserPostedImage
/ I am an external associate and I come as a documentary maker and a model designer. With the owner of Mr. Urbic I have known for almost 50 years, we have also started to work both at the beginning of the 60's /
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#116 Posted : 26 July 2018 21:17:32(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
This large board with plenty of wireless power lines is full of electronics and servo motors
UserPostedImage
Each stopping place has its own servo lifting magnet
UserPostedImage
Servo motors and control plates for numerical lighting control
UserPostedImage
Decoders for occupying certain parts of the road at stopping places
UserPostedImage
Switches can have more placement ...
UserPostedImage
UserPostedImage
A special machine is designed for drilling numerous round and oval holes
UserPostedImageUserPostedImageUserPostedImage
thanks 3 users liked this useful post by 1borna
Offline 1borna  
#117 Posted : 09 August 2018 21:14:36(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageThe garage has a door opening with the engine
UserPostedImage
UserPostedImage
Preparing for the first test drive
UserPostedImage
Vehicles go through the entire layout
UserPostedImage
UserPostedImage
UserPostedImage
thanks 7 users liked this useful post by 1borna
Offline 1borna  
#118 Posted : 17 August 2018 20:42:22(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The small layout for learning to ride with Roco material will get a tunnel (children are always interesting when the train enters it)
UserPostedImage
The tunnel will be fully trained in the walls
UserPostedImage
UserPostedImage
UserPostedImage
UserPostedImage
The whole hill can easily be removed
UserPostedImage
UserPostedImage
Layout can be divided into 5 equal parts for easier transport to exhibitions
UserPostedImage
UserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#119 Posted : 29 August 2018 21:00:25(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Some places on the layout always revitalize me so I try to shoot them from another angle
UserPostedImage
UserPostedImageUserPostedImage
UserPostedImage
UserPostedImage
How much detail is there in a small space?
UserPostedImage
UserPostedImage
UserPostedImage
UserPostedImage
thanks 6 users liked this useful post by 1borna
Offline 1borna  
#120 Posted : 14 September 2018 20:58:13(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
A little different look at the layout
UserPostedImage
UserPostedImage
UserPostedImage
This way I often went through while I went to work
UserPostedImage
UserPostedImage
UserPostedImage
UserPostedImage
In reality, there are lots of parked cars here
UserPostedImage
UserPostedImage
thanks 6 users liked this useful post by 1borna
Offline 1borna  
#121 Posted : 28 September 2018 21:06:42(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImage
Finally came the time that the vehicles with wireless power are running throughout the layout

UserPostedImage
Some driving routes are still being edited
UserPostedImage
I looked a little aloof from the ground, with numerous train strings joining them for the road
UserPostedImageUserPostedImage
UserPostedImageUserPostedImage
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#122 Posted : 15 October 2018 21:28:37(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImage
I started to climb inside the big helix
UserPostedImageUserPostedImageUserPostedImageUserPostedImage
And I'm on top, almost 4 meters high!
UserPostedImage
I feel like I'm on a plane
UserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#123 Posted : 25 October 2018 21:00:41(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Wider look and then details
UserPostedImageUserPostedImageUserPostedImageUserPostedImage
Little bit farther
UserPostedImageUserPostedImage
In the approach helix is a small station
UserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#124 Posted : 04 November 2018 20:02:30(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
When I first saw this, I was surprised because I did not know what that would be?
UserPostedImage
Then it was the current story of Tayllands boys in the cave
UserPostedImage
The team decided to make a concealed cave, the pipes on the hill serve for an infinite flow of infrared air, providing the layout
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline dominator  
#125 Posted : 05 November 2018 04:55:46(UTC)
dominator

New Zealand   
Joined: 20/01/2015(UTC)
Posts: 1,199
Location: Kerikeri
Another soccer team in trouble eh.

Very good.

Dereck
Northland. NZ REMEMBER 0228 for ä
thanks 1 user liked this useful post by dominator
Offline 1borna  
#126 Posted : 05 November 2018 21:23:57(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
There are several pictures
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#127 Posted : 14 November 2018 21:19:43(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
This summer, a group of young men from Sweden came to visit us
UserPostedImage
With a great deal of interest they looked at the layout
UserPostedImage
I asked them down and they played with the trains, and they replied that they were doing it in childhood
UserPostedImage
And smaller layouts are interested in them and they friends of showed how to ride
UserPostedImage
UserPostedImage
When driving the trains they were very serious, better than kids!
UserPostedImage
It took a long time for them to come out, so I had to say hello to them
UserPostedImage
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#128 Posted : 30 November 2018 20:42:21(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImage
Layout King Tomislav Square always delights, this way often pass
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
There are other areas on a large layout that remind me of the past
UserPostedImageUserPostedImageUserPostedImage
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#129 Posted : 07 December 2018 19:46:22(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
One day I was surprised to find that there was no more beautiful square yet?
UserPostedImage
When I got down to the basement I saw that she was back in a new place
UserPostedImage
Trains will be driving around this time
UserPostedImage
Market will get snow attire which is natural given that at its center a winter skating rink
UserPostedImageUserPostedImage
Every day it looks better
UserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#130 Posted : 16 December 2018 21:22:49(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Today, a new movie of a young singer with the effects of King Tomislav's square layout has been released
[YOUTUBE]www.youtube.com/watch?time_continue=222&v=YQF_shalrU0[/YOUTUBE]

Edited by user 18 December 2018 21:21:52(UTC)  | Reason: Not specified

thanks 1 user liked this useful post by 1borna
Offline 1borna  
#131 Posted : 25 December 2018 20:52:20(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The wall is broken and the layout begins to merge into the new part
UserPostedImage
The connection to the elevator is accurately made because trains run over it
UserPostedImage
With the lowest position going to the basement
UserPostedImage
He's coming to helix
UserPostedImage
UserPostedImageUserPostedImage
Going through the door comes to the last helix
UserPostedImageUserPostedImage
The lowest floor helix goes to King Tomislav Square Square, and the two taller will go further on the wall toward future parts of the layout
UserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#132 Posted : 04 January 2019 21:13:26(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Today's Ivica Kostelic to do a technical review of the cable cars and ski slopes, tomorrow and the day after tomorrow is on Sljeme overlooking Zagreb held the world cup skiing

Ivica Kostelic is a Croatian skier. Although at the beginning of his career he was considered exclusively by the slalom specialist, he has developed for years with one of the most versatile skiers of today. In season 2010/2011. has celebrated the greatest success of his career so far, winning a large crystal globe

The trains went to the basement


For now, there is not much to do because the tests are still under way

Everyone approaches the elevator and they only have ramps (this will be more stories)
thanks 5 users liked this useful post by 1borna
Offline 1borna  
#133 Posted : 05 January 2019 20:42:22(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska




thanks 5 users liked this useful post by 1borna
Offline 1borna  
#134 Posted : 13 January 2019 21:48:06(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#135 Posted : 26 January 2019 21:27:30(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Still a little picture of the finished layout
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline 1borna  
#136 Posted : 15 February 2019 21:07:36(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
This unusual cell building was created by placing one half of the cell on the other
UserPostedImageUserPostedImageUserPostedImage
She has some nice details
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline 1borna  
#137 Posted : 28 February 2019 22:07:30(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
For small visitors made a special layout
UserPostedImageUserPostedImage

UserPostedImage
It has recently been moved to 2 bigger
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
The slightest quickly learn to drive trains
UserPostedImage
thanks 8 users liked this useful post by 1borna
Offline 1borna  
#138 Posted : 16 March 2019 20:55:32(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The arrangement of facilities in this city has not yet been determined
UserPostedImage
UserPostedImageUserPostedImage
And here's going to be a lot of changes
UserPostedImage
They'll be driving under the railroad to the town
UserPostedImageUserPostedImage
And on the other side there is an exit
UserPostedImage
For the needs of layouts with over 300 meters the road should be processed on a wireless power supply of at least 100 vehicles
UserPostedImageUserPostedImage
thanks 9 users liked this useful post by 1borna
Offline 1borna  
#139 Posted : 27 March 2019 20:33:27(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline 1borna  
#140 Posted : 09 April 2019 20:50:44(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Layout is a big one that in it there are a lot of different details
UserPostedImage
Some should be looked at from different angles
UserPostedImage
For some distant, would it be good to have a binoculars?
UserPostedImage
All the bridges are a manual work of a sworn team
UserPostedImage
The objects were bought but they were all painted or processed later
UserPostedImage
This part I always love to paint
UserPostedImageUserPostedImage
Much time has been spent on that little piece of layout
UserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#141 Posted : 18 April 2019 21:12:57(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 6 users liked this useful post by 1borna
Offline kiwiAlan  
#142 Posted : 19 April 2019 13:13:13(UTC)
kiwiAlan

United Kingdom   
Joined: 23/07/2014(UTC)
Posts: 8,268
Location: ENGLAND, Didcot
Some great mini scenes there, excellent work. ThumpUp ThumpUp ThumpUp ThumpUp

The scene with the wedding couple coming out of the church reminds me of seeing a couple being driven around town in a car with the top down and much honking of horns as they went, when we were travelling around Germany in 1997.

Red Van Man better watch out for that cyclist coming down the hill in the first photo though ... Scared
thanks 1 user liked this useful post by kiwiAlan
Offline TEEWolf  
#143 Posted : 19 April 2019 18:44:25(UTC)
TEEWolf


Joined: 01/06/2016(UTC)
Posts: 2,465
Originally Posted by: kiwiAlan Go to Quoted Post
Some great mini scenes there, excellent work. ThumpUp ThumpUp ThumpUp ThumpUp

The scene with the wedding couple coming out of the church reminds me of seeing a couple being driven around town in a car with the top down and much honking of horns as they went, when we were travelling around Germany in 1997.


Indeed ThumpUp ThumpUp ThumpUp ThumpUp and ah, thanks, I thought it was in much younger days. I was already searching where will be @RayF at his daughter wedding? Wink Smile ThumpUp


Offline 1borna  
#144 Posted : 05 May 2019 21:53:29(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
I always like to see what is being done or repaired
UserPostedImage
Here are inventions, assembling and testing various electronic circuits
UserPostedImage
UserPostedImageUserPostedImage
Some old machines are adapted to new needs
UserPostedImageUserPostedImage
For small work- small tools
UserPostedImage
UserPostedImageUserPostedImage
thanks 3 users liked this useful post by 1borna
Offline 1borna  
#145 Posted : 24 May 2019 21:59:58(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
The new part of the layout will have 2 depots for steam and diesel and electric locomotives
UserPostedImage
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 3 users liked this useful post by 1borna
Offline 1borna  
#146 Posted : 06 June 2019 20:55:31(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImageUserPostedImage
thanks 4 users liked this useful post by 1borna
Offline 1borna  
#147 Posted : 19 June 2019 20:40:37(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
UserPostedImage
Nearly every day the announced groups of children come from kindergartens, elementary schools to middle schools and faculties
UserPostedImage
Layout works are interrupted and visitors are divided into 2 groups, one up and the other in the basement
UserPostedImageUserPostedImage

thanks 5 users liked this useful post by 1borna
Offline ocram63_uk  
#148 Posted : 22 June 2019 13:07:41(UTC)
ocram63_uk

United Kingdom   
Joined: 07/01/2015(UTC)
Posts: 708
Location: England, Suffolk
need to come back to Zagreb and see the new bits of the layout :-)
thanks 1 user liked this useful post by ocram63_uk
Offline 1borna  
#149 Posted : 22 June 2019 13:21:55(UTC)
1borna

Croatia   
Joined: 21/12/2012(UTC)
Posts: 1,424
Location: Hrvatska
Thank you, we will be happy to visit us again!
Link
(Currently, it's not some days working holidays)
Offline TEEWolf  
#150 Posted : 22 June 2019 17:05:42(UTC)
TEEWolf


Joined: 01/06/2016(UTC)
Posts: 2,465
Originally Posted by: 1borna Go to Quoted Post
Thank you, we will be happy to visit us again!
Link
(Currently, it's not some days working holidays)


I always enjoy your report and pictures. I never have been in Croatia. I should think about it to go to Zagreb once. Google told me, it is about 800 km or 15 hours by train away from my hometown.BigGrin

Anyway, this youth hostel (it is the "AdriaticTrainHostels", Zagreb?) in this train wagon would be a very nice experience as well. At which station is it located in Zagreb? You have so many train stations there.BigGrin How far away is the "Still Standing Adriatic Real Express" from the "Backo Mini Express"?Smile
thanks 1 user liked this useful post by TEEWolf
Users browsing this topic
OceanSpiders 2.0
6 Pages<12345>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 3.765 seconds.