Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline Andreas K  
#1 Posted : 22 February 2011 16:24:13(UTC)
Andreas K


Joined: 04/11/2010(UTC)
Posts: 191
Location: South Africa.
Hallo again,
The problems with routes still exist, where part of route do not switch.
I have my CS1 connected to my CS2 and can control both loco’s and turnouts (points) from both CS’s.
I was wondering, will the routes work properly (or at all) if I connect the S88’s to the CS1 and not the CS2 and then add the same routes I have on the CS2 to the CS1?
Will anything blowup?
Any comments would be appreciated.
Regards
Andreas K
Pure Marklin - Steam is my Passion
Offline Andreas K  
#2 Posted : 24 February 2011 08:41:16(UTC)
Andreas K


Joined: 04/11/2010(UTC)
Posts: 191
Location: South Africa.
Hi all,
For those who are running routes with CS2 and experiencing problems I think here is a solution IF you have a CS1.
I took a change and connected all my S88’s to my CS1 and earthed them from the CS1 (brown wire). As my CS1 is connected to my CS2 via a crossover cable all routes are triggered and work properly. It seems they also switch bit faster.
BigGrin BigGrin BigGrin
Regards
Andreas K
Pure Marklin - Steam is my Passion
Offline Piper  
#3 Posted : 24 February 2011 10:58:18(UTC)
Piper

South Africa   
Joined: 13/09/2005(UTC)
Posts: 262
Location: Johannesburg
BigGrin

Well done Andreas, you are a brilliant man. How many trains are you running?

Pieter
Era I-V / HO / C-Track / MS2, CS2 & CS3 Z gauge. Insider
Member of Märklin Modellers Group
Offline Andreas K  
#4 Posted : 10 March 2011 13:52:38(UTC)
Andreas K


Joined: 04/11/2010(UTC)
Posts: 191
Location: South Africa.
Hi all,
Thanks Pieter, I did some further test runs and all OK. Besides one incident which was an error on the programming of the routes itself. (One signal that was not suppose to be in a route was accidental added and it started a train on a different route)
Everything runs smoothly and all my routes are working properly as it was intended. Currently I am running 23 Loco’s where one stops and the next one starts up. There are 11 Loco’s running at any given time. This excludes the shuttle trains. I am thinking of adding another S88 to the CS2 which then only controls the shuttles.
Regards
Andreas K
Pure Marklin - Steam is my Passion
Offline dntower85  
#5 Posted : 10 March 2011 14:58:18(UTC)
dntower85

United States   
Joined: 08/01/2006(UTC)
Posts: 2,218
Location: Shady Shores, TX - USA
I am surprised that it is actuality faster with the S88 Connected to the CS1, I'm surprised that it even worked.
The CS2 may be programed to look for commands from a CS1 before it poles the S88 which seams backwards. Maybe all the years it took ESU to get an s88 Bus connection for the CS1 was worth something.


That is a good find Andreas, ThumpUp
DT
Now powered by ECoS II unit#2, RocRail
era - some time in the future when the space time continuum is disrupted and ICE 3 Trains run on the same rails as the Adler and BR18's.
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2025, Yet Another Forum.NET
This page was generated in 0.633 seconds.