Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline JohnMishler  
#1 Posted : 17 May 2025 03:19:04(UTC)
JohnMishler

United States   
Joined: 06/02/2014(UTC)
Posts: 61
Location: Sabetha KS and Mount Airy NC
While operating my layout in RR, two switches appear to somehow be synchronized (see the screen shot below):

The two switches with the red squares seem to always either both be "straight" or "thrown." If one switch is changed by RR as a route is reserved, the other switch changes too even if it isn't in the route. Most often this isn't a concern however on occasion this can cause a lok to simply be stalled in a "wait" status because a switch is in the wrong orientation for the route. I cannot for the life of me see where in setup these two switches have been set to synchronize with one another. Note that I can change (as in the screen shot) so that they are orientated differently. Any thoughts?
John
Check out progress on my layout here.
Users browsing this topic
Guest, RudiC
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2025, Yet Another Forum.NET
This page was generated in 0.186 seconds.