Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

5 Pages«<2345>
Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline Timaximus  
#151 Posted : 21 October 2017 16:40:30(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
In this variant I turned the station a bit to get more walking space around it.

The Helix is now placed under the station level and starts at +50cm to +90cm. The station level itself is at +1,05m.

Both the turn table and the transfer table will only be used as parking space for locs. So also this time no depot theme with scenery.

Max ramp percentage: 3%.

UserPostedImage
Layout overall view

The ramp to the old station on level 1 (current table) will get a small station for some 'museum' material.

UserPostedImage
Station area.

More details will follow.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#152 Posted : 22 October 2017 20:05:29(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Here some 3D Views and the visibility sketch.

UserPostedImage
visibility sketch

UserPostedImage
3D View West

UserPostedImage
3D View South

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#153 Posted : 24 October 2017 21:35:50(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
This evening I start with the modification.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 9 users liked this useful post by Timaximus
Offline Timaximus  
#154 Posted : 25 October 2017 20:36:48(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The North West corner is almost done and also the turning loop is going fast.

I need to salvage some materials before the Hobbit is collection al the usefull parts. BigGrin

At this age they can use anything. Cool

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 9 users liked this useful post by Timaximus
Offline Timaximus  
#155 Posted : 27 October 2017 20:49:48(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
After 8 hours the table top is clean.

I only need to remove some cable and feedback modules under the table.

After some cleaning and sorting we can start with the real modification.

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#156 Posted : 28 October 2017 20:21:37(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Is disconnect the table sections that will be modified or removed.

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 9 users liked this useful post by Timaximus
Offline Timaximus  
#157 Posted : 29 October 2017 15:31:39(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I simplified the layout a bit and removed the small shadow area at the south side.

Instead of the shadow area we get a small shunting area at level '0' with a small elevation.

Also the shuttle trains can stop here for a while.

The exact position of the station plus helix frame can be justified later.

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#158 Posted : 09 November 2017 11:23:35(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I optimized the layout a bit.

The station (green tracks) is rotated 180 degrees and the length is increased with a 24188 piece.

The helix is moved to the lower left corner.

The main track (grey and black tracks) is kept at level +70cm and the station level will be at +110cm.

Both the turn-table and the transfer-table are back on the station level.

The red ramp can be connected from main track level to the station level as a light rail track or escape route.

The shunting area (blue tracks) is also changed.

UserPostedImage
Release candidate 1

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#159 Posted : 11 November 2017 14:57:16(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I spoke with my colleague today and he was surprised about the change and all the table sections that are removed at this moment.

But he liked the RC1 very much.

We discussed the available walking through space under the section between the helix and the station level.

So I changed the shunting area a little bit to create more walking space between the table sections. That will give us a RC2.

We have only one location we need to crouch a bit but the height is increased from +65 to approx. 105cm.

UserPostedImage

UserPostedImage

So maybe we can start with the building process again soon.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#160 Posted : 12 November 2017 13:17:34(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The 3D view of RC2.

More details to follow.

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#161 Posted : 19 November 2017 18:01:09(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I started with the modification myself.

The new ramp around the helix will be removable like the helix itself.

Which is necessary for maintenance.

For the removable part between the helix and the station layer see the image below.

The table for the shunting area will be modified along the edges, so the table you see on picture 5 can stay there.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus

Edited by user 19 November 2017 21:48:25(UTC)  | Reason: Not specified

Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#162 Posted : 21 November 2017 19:40:15(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I provisionally build the table section with the shunting area and place just some tracks on it.

Some small pieces are missing but they will arrive tomorrow I hope.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#163 Posted : 25 November 2017 13:38:39(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I make a plan for the coming period. This year we will focus on the base layer of the table.

The shunting area is placed, the final pieces arrived yesterday, so now we can finish the table surface at this area.

I also start gluing the second strip on the side of the 'parade' ramp.

I planned a temporary loop at the end of the helix (removable) to drive around during the building period.

That reduces the risk trains fall of when accidentally make a wrong switching action.

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#164 Posted : 01 December 2017 21:56:31(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The new track sections with brake and stop sections of the main track at level 0.

Red: stop,
Blue: brake,
Black: drive,
Orange: stop or brake,
Yellow orange: stop or brake,
White: switching area.

With 14m the helix will be the longest track section.

The shortest track section between the two switching areas is 2.2m long.

the 4 loops at the lower right will be used as hold sections for a short period.

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#165 Posted : 02 December 2017 19:12:27(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today father finished the last table sections. So the table surface for the base level is nog ready for the rubber and the table borders from bendable Triplex.

Today I was the assistant and meanwhile i sorted the remaining track parts and cleaned the table in the other areas.

The rubber what is left is not enough for the large shunting area so I need to order new first.

The short parade track is now stiffened with bending Triplex at both sides. So also the rough table structure at this side is finished.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#166 Posted : 09 December 2017 17:48:05(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today we make the manhole larger inside the loop.
We placed the derailing beams around the table until the north east corner.
We closed the corners of the table border.
We build up and closed the level at the south east side.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#167 Posted : 12 January 2018 16:32:38(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Below the new Signal plan for building fase 1, the main track level.

We decide to place signals on the main level also. That is because you can see almost every track through the very open table layout.

The layout for fase 1, besides the temporarily loop, is finished.

We hope to finish the table borders tomorrow and start with the scenery fase next time.

The temporary loop will be built during the scenery fase.

The speed of progress is not as it was before but that is because my companion is in Chemo session now. So sometimes he felt not so good to build.

But we both enjoy the building still like before. And that is the most important thing.

But not much photo’s the coming period, sorry for that.

I also will connect some power wires so the little Hobbit can enjoy the hobby again also.

UserPostedImage

Best regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 4 users liked this useful post by Timaximus
Offline Timaximus  
#168 Posted : 13 January 2018 19:00:14(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The fact that father is not at his best at the moment, because of the Chemo, he enjoyed the building today.

We finished the table borders and updated the Helix. Now we are able to stand inside the helix and can reach everything around it.

After laying the rubber and connecting the wires we can start with the scenery at level 0 , the main track.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#169 Posted : 29 January 2018 09:15:01(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Finally we finished the table construction for level 0 and place the new rubber on it.

But before that we cut the turn outs shape in the table top layer. So the decoders and actuators are reachable for maintenance.

I also finished the signal plan. with 27 old vorm signals from VIESSMANN and 55 new light signals from Märklin

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#170 Posted : 01 February 2018 11:00:37(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I make a small modification in the track layout to make the connection between the Helix and the Loop + Station section at level 1 more flexible to build.

To do that I changed the C-track into K-track Flex. Now the position and angle can be compensated with the Flex track (purple) on the adapter plate.

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 4 users liked this useful post by Timaximus
Offline Timaximus  
#171 Posted : 01 February 2018 19:14:32(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The contour of the loop section and the necessary Triplex plates.

Only one left turn out is missing.

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 4 users liked this useful post by Timaximus
Offline Timaximus  
#172 Posted : 03 February 2018 20:17:58(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today we built the frame for the Loop section. Later this frame will be modified to the contour of the track layout. The temporary poles in the corners will be replaced by poles standing on the lower table section.


UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Best Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 7 users liked this useful post by Timaximus
Offline Timaximus  
#173 Posted : 19 February 2018 09:06:12(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
This weekend we work further about the loop section Part A.

The construction is light and stiff enough to prevent bending in the middle.

After we place the Triplex borders next week the stiffens will be even greater.

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Thewolf  
#174 Posted : 19 February 2018 10:02:12(UTC)
Thewolf

Canada   
Joined: 08/09/2015(UTC)
Posts: 2,059
Location: Cowansville, QC
Impressive! You feel the know-how and experience. Congratulations

Thewolf
Project Estrie Rail Road-CS3-Track C- Itrain-Digital
Offline Timaximus  
#175 Posted : 24 February 2018 20:02:08(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Thanks.



Today we finished the loop section and start with the borders and side parts for the transfer table.

For the 3 legs we are looking for a more attractive and more stable solution.

To be continued...

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#176 Posted : 07 March 2018 17:19:20(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The new, and better looking, table legs and wheels arrived.

The legs will be cut first at the correct length. Then the wheels will be fixed with a sandwich of Multiplex discs under those table legs.


UserPostedImage


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 7 users liked this useful post by Timaximus
Offline Timaximus  
#177 Posted : 10 March 2018 18:16:28(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today we finished the loop table section.

The construction is stiff and lightweight.

The temp poles are replaced with nice table legs plus wheels.

The moving (+/-60cm) and rotating (+/-10 degrees) goes smooth now.

Next weekend we planned some cleaning activities.


UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 9 users liked this useful post by Timaximus
Offline Timaximus  
#178 Posted : 25 March 2018 12:16:52(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
We finished the table construction for the loop section and are now aiming for the connection between the loop section and the helix + turn-table section.

The track piece on the floor was for the dimensions of the curved section between the loop section and the helix.



UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 8 users liked this useful post by Timaximus
Offline Timaximus  
#179 Posted : 28 April 2018 16:28:00(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
It is time to stop for a while. :)

We will be back next winter!

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 1 user liked this useful post by Timaximus
Offline utkan  
#180 Posted : 28 April 2018 19:06:24(UTC)
utkan

Turkey   
Joined: 14/07/2009(UTC)
Posts: 19,116
Location: Istanbul,
Originally Posted by: Timaximus Go to Quoted Post
It is time to stop for a while. :)

We will be back next winter!

Regards,

Timaximus

Oh my Gosh! How can you wait till winter?
It has been only almost two months I haven’t laid a finger on my goodies...and it is a torture for me...BigGrin
Looking forward to winter then...ThumpUp
Do unto others, as you would have them do unto you...
thanks 2 users liked this useful post by utkan
Offline Timaximus  
#181 Posted : 14 January 2019 10:48:34(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Hello All,

I restarted this Christmas so here some pictures of the progress so far.

I start building the new fly over wich can be opened.
UserPostedImage
UserPostedImage
UserPostedImage

The power connections of the movable table section is finished.
UserPostedImage

I wired the Helix and found a solution for the wiring.
UserPostedImage
UserPostedImage
UserPostedImage

Me and my son did some test driving during the holidays. He likes and chose every train on the tracks.
UserPostedImage

Started with the installation of the Uhlenbrock Power 3 Boosters
UserPostedImage

Schematic for the layout with signal-, switch- and feedback contact numbers.

Best Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 7 users liked this useful post by Timaximus
Offline rbw993  
#182 Posted : 14 January 2019 20:07:31(UTC)
rbw993

United States   
Joined: 19/08/2008(UTC)
Posts: 971
Impressive carpentry - I like the minimalist style!

Regards
Roger
thanks 1 user liked this useful post by rbw993
Offline Timaximus  
#183 Posted : 15 January 2019 12:04:20(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Thanks!

I Will tell the carpenter.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 1 user liked this useful post by Timaximus
Offline petestra  
#184 Posted : 15 January 2019 12:33:42(UTC)
petestra

United States   
Joined: 27/07/2009(UTC)
Posts: 5,860
Location: Leesburg,VA.USA
Excellent! I love the way you made your storage yards. Layout looks great! Cheers, Peter. Cool ThumpUp ThumpUp ThumpUp
Offline Timaximus  
#185 Posted : 15 January 2019 17:21:53(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Thanks,

The big one in the middle will be the Central Station.

I hope to start with the scenery soon but first everything needs to be (re)wired, feedback contacts, signals, switch lights etc. ect.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 2 users liked this useful post by Timaximus
Offline Timaximus  
#186 Posted : 11 March 2019 16:10:49(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
This weekend we started with the scenery phase. The first item we worked on is the creation of a sheet piling curtain.

The little man inspect the first badge of signals that arrived recently.

Further I updated the feedback contacts inside the station area to create more shunting options.

And (grand)pa give his whole N-scale collection to his grandson.


UserPostedImage

UserPostedImage

UserPostedImage

UserPostedImage

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#187 Posted : 20 March 2019 17:13:44(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
I replaced the older IB and IB-IR with a brand new IB2.

The old IB's will be extra controllers around the layout.

With the new IB2 I did some test driving around the layout.

Now I am connecting all the feedback modules with the LocoNet via self-made LocoNet cables.

UserPostedImage

UserPostedImage

YouTube link: Testdrive with met E44, BR01 en De Koploper

Best Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 4 users liked this useful post by Timaximus
Offline Timaximus  
#188 Posted : 25 March 2019 11:17:33(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
This weekend Grandpa build the second sheet piling curtain.

I finished the feedback wiring of station 'Zuid' and start with the LocoNet network infrastructure.

There are some changes in the feedback contact plan for station 'Centraal'. These changes are updated on the schema below.


UserPostedImage

UserPostedImage

>>> Overall track, signal and feedback contact schema.


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 3 users liked this useful post by Timaximus
Offline Timaximus  
#189 Posted : 13 April 2019 14:59:16(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
It is time for the summer stop again. BigGrin

See you next winter.

Regards,

Timaximus

Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 1 user liked this useful post by Timaximus
Offline hxmiesa  
#190 Posted : 30 November 2019 21:49:01(UTC)
hxmiesa

Spain   
Joined: 15/12/2005(UTC)
Posts: 3,556
Location: Spain
Originally Posted by: Timaximus Go to Quoted Post
It is time for the summer stop again. BigGrin
See you next winter.

Well, it´s more or less winter again now, isn´t it? ;-)

Best regards
Henrik Hoexbroe ("The Dane In Spain")
http://hoexbroe.tripod.com
thanks 1 user liked this useful post by hxmiesa
Offline Timaximus  
#191 Posted : 01 December 2019 16:11:15(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Yes it is winter now, in December. BigGrin

Because of your reply we went to the train room and found the light signals we need to test and program before we can place them along the track.

This winter I will spend a lot of time with the testing, programming and placing all the signals. There will be a lot of them, form and light types. And still 20 entry light signals are missing and need to ordered at my supplier.

Hopefully I finish the signal business this winter so we can start with the scenery next winter.

But first I need to check the last status from the last winter, installing the feedback contacts, switch engines and rail decoders. I do not know where I stopped before summer. Confused

My son already started with the scenery and place some snow pieces along the layout. RollEyes

ReStart_Winter_2019

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 4 users liked this useful post by Timaximus
Offline Timaximus  
#192 Posted : 08 December 2019 16:30:15(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today I only place the 13 signals at 'Wisselcomplex Zuid'.

The administration of the decoder addresses etc. was faulty so I need to correct this first in Excel.


UserPostedImage
Klick on image to show an larger version

After an inspection I realized that I still need to place 4 switch actuators and some feedback connections inside the Central Station.

Hopefully the signals are working next week. BigGrin

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 6 users liked this useful post by Timaximus
Offline Timaximus  
#193 Posted : 11 December 2019 08:37:41(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
The first Märklin light signals are up and running. Only 53 more to go! BigGrin

The signals are very easy to place, program and install.

I mount the decoder box with a tyrap above the beams under the table section.


UserPostedImage

UserPostedImage


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline Timaximus  
#194 Posted : 11 December 2019 14:53:16(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Today the new WinDigipet 2018 Premium edition arrived.

Now I can finally start with the automation for this Lay-Out.

The old laptop with WDP 9.2 is retired now. BigGrin


UserPostedImage


UserPostedImage

Klick on image for larger version


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 3 users liked this useful post by Timaximus
Offline eberhardt  
#195 Posted : 14 December 2019 01:00:33(UTC)
eberhardt

United Kingdom   
Joined: 06/11/2011(UTC)
Posts: 77
Location: Staffordshire.
All I can say is, incredible! I've just read through the whole of this and I'm amazed, the complexity is beyond me, when I start on my layout it's going to look a bit tame after this. You are a very skilled man and I'm going to copy your helix, mine won't be as big as I only need two layers. John.
thanks 1 user liked this useful post by eberhardt
Offline Timaximus  
#196 Posted : 15 December 2019 08:39:16(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Thanx!

I use R5 an R4 in the helix. And 10 cm per loop.

So the grade stays below 3%.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 2 users liked this useful post by Timaximus
Offline Mattloco  
#197 Posted : 16 December 2019 04:21:21(UTC)
Mattloco

United States   
Joined: 06/04/2019(UTC)
Posts: 0
Location: Florida, Miami
Mr Timaximus, thank you so much for posting your project with so much details, and sharing your very qualified thinking, in what is an endless "problem solving" hobby. I am just getting back into it, after a 40 year interruption, and I am learning so much from you! Your work is first class and really inspires me! Your hobbit appears pretty cool, and I hope the very best for your dad in what has to be dificultad times..... Thank you again for taking the time to share, with us!
thanks 1 user liked this useful post by Mattloco
Offline Timaximus  
#198 Posted : 16 December 2019 07:23:57(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Thanx!

The next period I am filling WinDigiPet.

And installing the other signals along the track.

Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 1 user liked this useful post by Timaximus
Offline Timaximus  
#199 Posted : 22 December 2019 09:22:17(UTC)
Timaximus

Netherlands   
Joined: 19/06/2004(UTC)
Posts: 1,412
Location: Home
Yesterday we place the final borders along the track around the helix. This track section is a short parade track so the border in front is kept low.

When the scenery is finished a Plexiglass fence is placed.

After the building activity we drive with the trains for a while.

Grandpa enjoyed this day. It was a long time ago we build together for the last time. So, grandpa was very happy that he was able to came over this day.


UserPostedImage

UserPostedImage


Meanwhile I am placing the rest of the signals, approx. 80 pieces.


UserPostedImage
Signals S5.13 and S5.14 (right) and signals S5.11 and S5.12 (left)

UserPostedImage
Current work place (temporary)


Regards,

Timaximus
Märklin | HO | C+K Track | Digital | I+II+III+IV+V | Power and control by Uhlenbrock | Win-Digipet
thanks 5 users liked this useful post by Timaximus
Offline kiwiAlan  
#200 Posted : 22 December 2019 20:49:21(UTC)
kiwiAlan

United Kingdom   
Joined: 23/07/2014(UTC)
Posts: 8,216
Location: ENGLAND, Didcot
Originally Posted by: Timaximus Go to Quoted Post


UserPostedImage
Current work place (temporary)


Regards,

Timaximus


Ah, the buffet car has arrived on track 1 ... Laugh Laugh Laugh Laugh Laugh

thanks 2 users liked this useful post by kiwiAlan
Users browsing this topic
OceanSpiders 2.0
5 Pages«<2345>
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 1.573 seconds.