marklin-users.net community | Forum
»
General topics
»
Digital
»
CS2 Update v4.1.2(3) : [ system(4.1.1) : cs2-gui(4.2.0(3)) : webserver (4.1.1) : spielewelt(4.1.1) ]
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
_version.png) system(v4.1.1) ... 25-04-2016 cs2-gui(v4.2.0(3)) 25-04-2016 WebServer (v4.1.1) 18-05-2016 spielewelt(v4.1.1) 21-03-2016
.png) No ChangeLog No new Help files English translation still missing 40system/paket.cs2
.name=system .descr=Update erneuern, CS2-Script erneuern, Update Decoderprojekte neu .vers=4.1.1 .date=25.04.2016 42webserver/paket.cs2
.name=webserver .descr=Webserver installieren, Verbindung mit Decodertool ermöglicht .vers=4.1.1 .date=25.04.2016 50gui/paket.cs2
.name=cs2-gui .descr=CS2-Haupt-Programm (GUI) updaten (ohne Spielewelt) .vers=4.2.0(3) .date=18.05.2016 60spielewelt/paket.cs2
.name=spielewelt .descr=Bilder und Filme für Spielewelt-Loks erweitern .vers=4.1.1 .date=21.3.2016 73decoder/paket.cs2
.name=decoder .descr=Update-Files für Decoder-Firmware (mSD/mLD und mSD3/mLD3) und Sound-Firmware .vers=1.17.19.0 + 1.032 + 3.0.1.0 + 3.0.1.2 .date=19.5.2016 /etc
udev/rules.d/70-persistent-net.rules /usr/local/bin
mountwrapper.arm update_sound.fn /opt
cgi-bin/update.sh www/hilfe/.keep /usr/bin
unzip zip /home/cs2/spiel)
bilder/pfeilnachlinks_weiss.png bilder/pfeilnachoben_weiss.png bilder/pfeilnachrechts_weiss.png bilder/pfeilnachunten_weiss.png definition/fahrpult4.cs2 definition/fahrpult8.cs2 hebel_111/fahrpultelement.cs2 hintergrund/kran_gelb.png hintergrund/kran_schwarz.png Edited by user 26 May 2016 08:52:17(UTC)
| Reason: Not specified |
Peter
|
 4 users liked this useful post by clapcott
|
|
|
Joined: 16/02/2004(UTC) Posts: 15,446 Location: DE-NW
|
The Q1 upgrade has arrived - and it isn't June yet.
They announced there would be a new prompt when mfx+ locos register for the first time. Too many locos were sent to Göppingen because they had run out of virtual coal, sand, or water. Version 4.2 is meant to reduce that. |
Regards Tom --- "In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS  |
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
Maybe ... If I could translate it Googly =
The newly registered locomotive has Gameworld Expansion
For operating the in semi-professional mode (Incl. Fuel consumption and the possibility to make cab operation) Please press OK
For operation the standard mode (Without fuel consumption and the possibility to make cab operation) Please press Cancel
The mode of operation is possible in the Lok configuration with the menu item Modify game mode
 Edited by user 26 May 2016 09:20:20(UTC)
| Reason: Not specified |
Peter
|
 1 user liked this useful post by clapcott
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
|
Peter
|
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
decoder updates now have some of the bugs fixed
- no warning about bootloader - mDT/3 updates WORK without assistance - workaround/resolution to the "12345" item number display after v3.0.1.0 of a mSD/3 |
Peter
|
|
|
|
Joined: 16/02/2004(UTC) Posts: 15,446 Location: DE-NW
|
Originally Posted by: clapcott  Maybe ... If I could translate it It basically says "Press OK for Semi-Pro Mode or press Cancel for Standard Mode". Semi-Pro Mode was the old default setting that causes the trouble: loco slows down when resources are out. Press Cancel to play without refilling coal, water, and sand. |
Regards Tom --- "In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS  |
|
|
|
Joined: 08/09/2015(UTC) Posts: 2,078 Location: Cowansville, QC
|
Hi Peter Hi Tom A little question please ? For this update of the cs2, is a key usb in the cs2 necessary ? Thank you for your reply Thewolf |
Project Estrie Rail Road-CS3-Track C- Itrain-Digital |
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
Originally Posted by: Thewolf  ...For this update of the cs2, is a key usb in the cs2 necessary ? No, this has been available by the internet, direct to the CS2. A file download , to a PC and then onto a USB , MAY be made available from the Marklin website in time. If so it will be found at ... http://www.maerklin.de/d...nloads/software-updates/ |
Peter
|
 1 user liked this useful post by clapcott
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
L88 Configuration retention has been improved (fixed) |
Peter
|
|
|
|
Joined: 08/09/2015(UTC) Posts: 2,078 Location: Cowansville, QC
|
Hi everybody I tried to update Failed The cs2 informs : error resolving temporary failed error in rsyne protocoal data stream I shall try later Thewolf |
Project Estrie Rail Road-CS3-Track C- Itrain-Digital |
|
|
|
Joined: 08/09/2015(UTC) Posts: 2,078 Location: Cowansville, QC
|
i don't understand...on the Marklin website...no update is informed
I read the comment of Tom and Peter 2-3 times and it would concern the games(sets) " mfx sanding fuel oil .etc " that I do not have.
Thus useless update for me
I wait
Thewolf |
Project Estrie Rail Road-CS3-Track C- Itrain-Digital |
|
|
|
Joined: 15/03/2003(UTC) Posts: 9,594 Location: Australia
|
Originally Posted by: H0  ..Press Cancel to play without refilling coal, water, and sand.
Or buy an eCOS 2 and avoid all this silly nonsense.. |
Adrian Australia flag by abFlags.com |
 2 users liked this useful post by xxup
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
Originally Posted by: H0  The Q1 upgrade has arrived - and it isn't June yet.
They announced there would be a new prompt when mfx+ locos register for the first time. Too many locos were sent to Göppingen because they had run out of virtual coal, sand, or water. Version 4.2 is meant to reduce that. Umm ... I am not so sure... I have a feeling that the recent issues around the m*D/3 (mDT/3 in Apr and firmware issues from last week)) have forced their hand. Sure, the Kran mFX+ stuff was overdue - but are we not expecting some tweaks for Steam (American Mikado) and Diesel (EMD F7) that are suficiently different ? And while the mFX+ registration prompt was expected , it had been gazzetted for v4.2 (OK the new GUI is 4.2 but the package is 4.1.2 and that is what I would have thought would be referenced in any communication) ref: http://www.maerklin.de/e...digital/mfx-locomotives/The L88 stuff had been an issue since day one, and was probably just sitting ready to go Howevrer - no movement on the mFX signal management front - no really movement on the 32 function support front. - expected CS/3 awareness needed (maybe under the covers) It seems that there may have originally been a concerted aim to align with a CS/3 interoperability release, but as the CS/3 has already been bumped (and likely to do so again) it may just be prudent do to a mini/half-release to stem the calls to the servicedesk |
Peter
|
 2 users liked this useful post by clapcott
|
|
|
Joined: 16/02/2004(UTC) Posts: 15,446 Location: DE-NW
|
Originally Posted by: clapcott  - no really movement on the 32 function support front. I read on a dealer site that only the CS3 would support 32 functions. This may or may not be true. I still hope they will add support for 32 functions to the CS2 - but maybe they reserve this feature for the CS3 to make it more attractive. |
Regards Tom --- "In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS  |
|
|
|
Joined: 16/02/2004(UTC) Posts: 15,446 Location: DE-NW
|
Originally Posted by: xxup  Originally Posted by: H0  ..Press Cancel to play without refilling coal, water, and sand. Or buy an eCOS 2 and avoid all this silly nonsense.. Or don't buy mfx+ locos to avoid that silly malfunction. |
Regards Tom --- "In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS  |
|
|
|
Joined: 05/12/2008(UTC) Posts: 1,804 Location: Crozet, Virginia
|
Originally Posted by: H0  Or don't buy mfx+ locos to avoid that silly malfunction. Or just remember to change it back to normal operation when you first register it, which is what I do. My first mfx+ lok entered that mode in a track section running from a 6017 booster and it was a long slow crawl to an area where it could be changed or the fuel replenished. That lesson was quickly learned. Originally Posted by: H0  I still hope they will add support for 32 functions to the CS2 - but maybe they reserve this feature for the CS3 to make it more attractive. I am hoping for that too but I bet that they will withhold if from the CS2 to try to move us all into a CS3. Jim |
Regards,
Jim
I have almost all Märklin and mostly HO, although I do have a small number of Z gauge trains!
So many trains and so little time. |
|
|
|
Joined: 08/09/2015(UTC) Posts: 2,078 Location: Cowansville, QC
|
Hi everybody One of you can explain to me what that means? '' ERROR: Content Element type "dce_dceuid2" has no rendering definition!'' I read this on the marklin website when I want ckecking the downloads Thank you guys Thewolf |
Project Estrie Rail Road-CS3-Track C- Itrain-Digital |
|
|
|
Joined: 18/08/2007(UTC) Posts: 1,081 Location: Denmark
|
Originally Posted by: Thewolf  One of you can explain to me what that means? ''ERROR: Content Element type "dce_dceuid2" has no rendering definition!'' I read this on the marklin website when I want ckecking the downloads It is an error in their website CMS (Content Management System). A quick "Google" on the message tells me that it seems to be an error caused by a certain extension. The Märklin website uses the Typo3 CMS and this is the extension causing the problem: https://typo3.org/extensions/repository/view/dceI bet they will have it fixed soon.  |
|
 1 user liked this useful post by sjlauritsen
|
|
|
Joined: 08/09/2015(UTC) Posts: 2,078 Location: Cowansville, QC
|
Originally Posted by: sjlauritsen  Originally Posted by: Thewolf  One of you can explain to me what that means? ''ERROR: Content Element type "dce_dceuid2" has no rendering definition!'' I read this on the marklin website when I want ckecking the downloads It is an error in their website CMS (Content Management System). A quick "Google" on the message tells me that it seems to be an error caused by a certain extension. The Märklin website uses the Typo3 CMS and this is the extension causing the problem: https://typo3.org/extensions/repository/view/dceI bet they will have it fixed soon.  Thank you sjlauritsen Is it the reason why I cannot make the update version 4 ?? Thank you for your reply Thewolf |
Project Estrie Rail Road-CS3-Track C- Itrain-Digital |
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
One new? function that appears to have come in with this release is that the CS2 now completes it startup by leaving the track power SWITCHED OFF.
This , I think , is a very good idea. As the CS2 poweron/startup process can take quite a long time, it is not uncommon to be working with the layout, placing new locos and wagons on the track etc. Also, if some layout work has been done and needs testing, you want to be close to the CS2 - which historically literally means standing there waiting, or unplugging the cable.
An , initially, frustration aspect is that THERE IS NO INDICATION that this has happened. i.e. the STOP button is not lit to give an indication that the track power is off
|
Peter
|
|
|
|
Joined: 05/12/2008(UTC) Posts: 1,804 Location: Crozet, Virginia
|
Originally Posted by: clapcott  An , initially, frustration aspect is that THERE IS NO INDICATION that this has happened. i.e. the STOP button is not lit to give an indication that the track power is off
I agree that unpowered might be a good initial state for the system on boot up. But the CS2 should show its proper status at all times, especially at startup. I say that part is clearly a bug in the latest release and needs to be addressed. Edited by user 13 June 2016 13:28:50(UTC)
| Reason: Not specified |
Regards,
Jim
I have almost all Märklin and mostly HO, although I do have a small number of Z gauge trains!
So many trains and so little time. |
|
|
|
Joined: 18/08/2007(UTC) Posts: 1,081 Location: Denmark
|
Originally Posted by: Thewolf  Is it the reason why I cannot make the update version 4 ?? No, I do not believe so. You update to version 4.x using the update function on the CS2. The Märklin website has nothing to do with that. |
|
|
|
|
Joined: 16/02/2004(UTC) Posts: 15,446 Location: DE-NW
|
Originally Posted by: sjlauritsen  The Märklin website has nothing to do with that. At least not yet - the latest update on the website is version 3.7. This can be transferred to the CS2 using USB memory, suitable for CS2s without Internet connection. CS2s connected to the Internet can download version 4.1.2 automatically. |
Regards Tom --- "In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS  |
|
|
|
Joined: 11/02/2006(UTC) Posts: 696 Location: Cheshire, UK
|
Originally Posted by: clapcott  One new? function that appears to have come in with this release is that the CS2 now completes it startup by leaving the track power SWITCHED OFF.
This doesn't happen for me! Maybe it's a bug, and is configuration-dependent. I have seven 60174 boosters connected to my CS2, and everything is powered on when boot-up completes. This takes several minutes, though, as I have around 200 locos defined in the CS2, and you can see them being addressed one-by-one as the start-up process continues. Only when all the "live" locos have their lights on has the start-up completed. Nigel |
Märklin collector since age 5. H0 Collection from 1935 to today. |
 1 user liked this useful post by Nigel Packer
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
Originally Posted by: Nigel Packer  Originally Posted by: clapcott  One new? function that appears to have come in with this release is that the CS2 now completes it startup by leaving the track power SWITCHED OFF. This doesn't happen for me! Maybe it's a bug, and is configuration-dependent. .... I believe you are correct. The , hoped for, feature now appears to be nothing more than a by product of the CS2 waiting for all its configured devices to respond. In my case an un-powered L88 will cause this wait to be indefinite, until either - the L88 is connected and powered up - the STOP button is toggled OFF and ON. My situation was exacerbated by the fact that I had previously been playing with some other L88s (different serial number/mfx IDs) that are now not even connected to the CS2. But as there device awareness was still there the CS2 bootup hangs . The new version is far more attentive to the restoration of the L88 configuration (previously it didn't care and lost the details of the actual configuration, even though it still kept a register of the device itself) |
Peter
|
 1 user liked this useful post by clapcott
|
|
|
Joined: 12/12/2005(UTC) Posts: 2,448 Location: Wellington, New_Zealand
|
Just for completeness of reference on this topic ... ref: Marklin website http://www.maerklin.de/f...er_CS2-Version_4.1.2.pdfGoogly = ........................................................................................................................................................................... Update for CS 2 - Version 4.1.2 The following changes will be active after installing the update: 1. A control panel for the new Goliath crane 49954 is integrated into the MFX + ® gaming world. Of the 3 motors for the various movements of the crane may have only one enabled. This has been reflected in the user interface. As resource consumption of this model has the consumption of diesel fuel. 2. Immediately is requested during the registration of mfx ® locomotives + whether the consumption should be enabled to resources (game mode Semi-Professional). If the green tick operated this mode is active, when selecting the red "X" of the standard mode, however, is chosen. So then no consumption of operating materials is enabled. 3. The loading of Lok icons via the web interface is possible again now. 4. When the system is rebooted now are the states of the feedback modules 60881 - 60883 registered first, so that an automatic operation can be started directly. 5. The mfx-registration process has been optimized. Disturbing brief mfx indications in the display are thus eliminated. 6. Also multiple installation of new data in the current retrofit decoders are now no problem. ........................................................................................................................................................................... |
Peter
|
 2 users liked this useful post by clapcott
|
|
|
Joined: 11/02/2006(UTC) Posts: 696 Location: Cheshire, UK
|
Originally Posted by: clapcott  5. The mfx-registration process has been optimized. Disturbing brief mfx indications in the display are thus eliminated.
I'm still holding my breath about this one! I must admit, it *does* seem to be fixed . . . I've been complaining to Märklin about this since the CS2 first came out (is it really eight years ago?), and they finally seem to have cracked it. I'd always assumed that it was an issue with the GFP/TFP, but that hasn't changed (and the CS3 uses the same version 3.27 of the GFP). Anyway, well done Märklin! Nigel |
Märklin collector since age 5. H0 Collection from 1935 to today. |
|
|
|
Joined: 21/10/2004(UTC) Posts: 31,692 Location: United Kingdom
|
Marklin USA Digital newsletter May/June issue out now included 4.1.2(3)
Attach in PDF 650KB.
|
Large Marklinist 3- Rails Layout with CS2/MS2/Boosters/C-track/favorites Electric class E03/BR103, E18/E118, E94, Crocodiles/Steam BR01, BR03, BR05, BR23, BR44, BR50, Big Boy. |
 1 user liked this useful post by steventrain
|
|
|
marklin-users.net community | Forum
»
General topics
»
Digital
»
CS2 Update v4.1.2(3) : [ system(4.1.1) : cs2-gui(4.2.0(3)) : webserver (4.1.1) : spielewelt(4.1.1) ]
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.