Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline Mille  
#1 Posted : 05 September 2023 08:08:37(UTC)
Mille

Sweden   
Joined: 02/02/2023(UTC)
Posts: 64
Location: Stockholm
Im gone have two levels with tracks,both levels
is about 3*1,5 meters and it just gone be about
20 centimeter in between
So now my question
Wiring the lower level is no problem but how do
i wiring the upper level best way?
Many many cables gone be between the levels so
what should i use or do it so it not hanging wires
And interfer the trains on the lower level

Hope you understand what i mean.
English is not my first language😃
Offline Toosmall  
#2 Posted : 05 September 2023 11:12:09(UTC)
Toosmall

Australia   
Joined: 26/07/2021(UTC)
Posts: 616
Location: Sydney
175 amp Anderson plugs, or 350 amps if not sure! A heat gun works brilliantly for soldering heavy gauge wire (I have 2 x 120 watt Japanese soldering irons), use lead/tin solder, has a number of advantages over tin only. More than adequate for model trains.

IMG_20200817_155859116 (1).jpg

Failing that, route some 12 or 10 awg wire through your Labrinth, depending the distance.

Cable ties are handy, or these are even better, but I do screw them on, double sided tape is not a long term fastening.

(Australia)
https://www.jaycar.com.a...;searchText=Cable%20ties
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 0.296 seconds.