Hi!

The work was stopped when the tunnels were 60 cm off the route. 60 cm is not very much, but enough to cause problems.

http://www.hurriyetdaily...=52604&NewsCatID=352


Quote:
Work was halted on two railway tunnels – the nation’s longest -- being dug to accommodate a new high-speed line connecting Tel Aviv to Jerusalem. Officials halted to project while they determine how the 60-centimeter mistake could have happened and how they might be able to make the necessary corrections. According to the newspaper Haaretz, officials hope the error will not be a costly one. A massive digging machine that sets walls in place as it bores through the hills is operated by an Italian company subcontracting to the Israeli firm undertaking the project. The project is already two years behind schedule for a number of reasons, including litigation. In 2009, the state comptroller issued a report critical of the project’s planning.

Source:
http://themedialine.org/...5/2013&category_id=8
Regards
Tom
---
"In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS
UserPostedImage
thanks 5 users liked this useful post by H0
Offline utkan  
#2 Posted : 15 August 2013 23:18:01(UTC)
utkan

Turkey   
Joined: 14/07/2009(UTC)
Posts: 19,116
Location: Istanbul,
Originally Posted by: H0 Go to Quoted Post
Hi!

The work was stopped when the tunnels were 60 cm off the route. 60 cm is not very much, but enough to cause problems.

http://www.hurriyetdaily...=52604&NewsCatID=352


Quote:
Work was halted on two railway tunnels – the nation’s longest -- being dug to accommodate a new high-speed line connecting Tel Aviv to Jerusalem. Officials halted to project while they determine how the 60-centimeter mistake could have happened and how they might be able to make the necessary corrections. According to the newspaper Haaretz, officials hope the error will not be a costly one. A massive digging machine that sets walls in place as it bores through the hills is operated by an Italian company subcontracting to the Israeli firm undertaking the project. The project is already two years behind schedule for a number of reasons, including litigation. In 2009, the state comptroller issued a report critical of the project’s planning.

Source:
http://themedialine.org/...5/2013&category_id=8


I like the guy's comment.....'Why do Turks care about this?'.....BigGrin
Do unto others, as you would have them do unto you...
Offline H0  
#3 Posted : 15 August 2013 23:37:59(UTC)
H0


Joined: 16/02/2004(UTC)
Posts: 15,276
Location: DE-NW
The "problem" also made it into German mass media.
Only bad news is good news. And it's holiday season.

In Switzerland they dig tunnels from both sides and meet in the middle - off by only few centimetres. How boring.
Sensational achievement, but the tabloids prefer things that go wrong. That includes German and Turkish tabloids.

In Germany they want to dig tunnels. And estimated costs double before they even get started. That's also more interesting.
Regards
Tom
---
"In all of the gauges, we particularly emphasize a high level of quality, the best possible fidelity to the prototype, and absolute precision. You will see that in all of our products." (from Märklin New Items Brochure 2015, page 1) ROFLBTCUTS
UserPostedImage
thanks 1 user liked this useful post by H0
Offline xxup  
#4 Posted : 15 August 2013 23:40:30(UTC)
xxup

Australia   
Joined: 15/03/2003(UTC)
Posts: 9,477
Location: Australia
It's always big news when someone stuffs up a very expensive job.. Personally, I think that it would be a great tourist tale if they can leave the error in place..

Edited by user 16 August 2013 05:12:40(UTC)  | Reason: Not specified

Adrian
UserPostedImage
Australia flag by abFlags.com
thanks 2 users liked this useful post by xxup
Offline xxup  
#5 Posted : 15 August 2013 23:43:10(UTC)
xxup

Australia   
Joined: 15/03/2003(UTC)
Posts: 9,477
Location: Australia
Originally Posted by: H0 Go to Quoted Post
..In Germany they want to dig tunnels. And estimated costs double before they even get started. That's also more interesting.


Same problem down here.. But they then double the traffic counts to justify the project and then wonder why the toll operator goes broke within 12 months.. LOL
Adrian
UserPostedImage
Australia flag by abFlags.com
thanks 1 user liked this useful post by xxup
Offline petestra  
#6 Posted : 15 August 2013 23:48:30(UTC)
petestra

United States   
Joined: 27/07/2009(UTC)
Posts: 5,843
Location: Leesburg,VA.USA
Mama Mia, what-a mistake-a to make-a ! Scared Thanks for the story,Tom.

Peter
thanks 1 user liked this useful post by petestra
Offline jvuye  
#7 Posted : 16 August 2013 07:16:03(UTC)
jvuye

Belgium   
Joined: 01/03/2008(UTC)
Posts: 2,881
Location: South Western France
Originally Posted by: H0 Go to Quoted Post
....

In Switzerland they dig tunnels from both sides and meet in the middle - off by only few centimetres. ...


Yes Tom, very nice, eg. the New Alptransit-Gotthard 57 km double bore tunnel is a marvel. They used GPS and laser , and started digging from multiple locations!

But maybe that's because they learned it the hard way when they dug the Furka tunnel back in the 1970's...

They had ignored the fact that the tunnel was situated at 1500 m above sea level and thus the arc covered by the tunnel would be substantially longer than at sea level.

When they finally met , the total length of the tunnel was 3.6 m longer that calculated. but only 37 mm off-course!

To their defense, they had also major geological "surprises" and the tunnel couldn't be dug in a straight line.

Cheers

Jacques Vuye aka Dr.Eisenbahn
Once a vandal, learned to be better and had great success!
thanks 3 users liked this useful post by jvuye
Offline Yumgui  
#8 Posted : 16 August 2013 21:13:44(UTC)
Yumgui

United States   
Joined: 20/03/2011(UTC)
Posts: 1,660
Location: Paris, France
Originally Posted by: H0 Go to Quoted Post
... 60 cm off the route. 60 cm is not very much, but enough to cause problems...

Great info !

I cannot believe that 60cm cannot be "caught up", just wondering about what distance of re-boring is necessary to "catch up" ... ?

OK, so it costs more money, as all these major infrastructure jobs do ... proportionately, I bet it's a drop in the bucket, they ain't gonna stop now are they ?!

Y ThumpUp
If your M track is rusted ... DON'T throw it out !
Working on: https://studiogang.com/projects/all
My heavy train station renovation: https://youtu.be/QQlyNiq416A
Inspired by: http://www.nakedmarklin.com/... Am not alone in this universe, phew.
thanks 1 user liked this useful post by Yumgui
Offline petestra  
#9 Posted : 16 August 2013 22:24:53(UTC)
petestra

United States   
Joined: 27/07/2009(UTC)
Posts: 5,843
Location: Leesburg,VA.USA
I'm not a builder and never have been but I should think that a potential problem would

be if the 60cm error leads the project onto land which has not been appropriated for the

railway construction. I don't know how Israeli law works but I would imagine that could

lead to a delay if this happened? Hope it all turns out well! Peter Confused
Offline Yumgui  
#10 Posted : 16 August 2013 22:34:00(UTC)
Yumgui

United States   
Joined: 20/03/2011(UTC)
Posts: 1,660
Location: Paris, France
Originally Posted by: petestra Go to Quoted Post
... a potential problem would be if the 60cm error leads the project onto land which has not been appropriated for the railway construction. I don't know how Israeli law works but I would imagine that could lead to a delay if this happened? ...

Hah Peter,

From the recent past, I think this is less of an administrative problem ... than it remains a purely technical one above all, imho ... ^^

Y Cool
If your M track is rusted ... DON'T throw it out !
Working on: https://studiogang.com/projects/all
My heavy train station renovation: https://youtu.be/QQlyNiq416A
Inspired by: http://www.nakedmarklin.com/... Am not alone in this universe, phew.
thanks 1 user liked this useful post by Yumgui
Offline Webmaster  
#11 Posted : 16 August 2013 22:35:19(UTC)
Webmaster


Joined: 25/07/2001(UTC)
Posts: 11,162
Quite interesting - the "City Tunnel" in Malmoe, Sweden, was finished both before the deadline and also below budget...

http://en.wikipedia.org/..._Tunnel_%28Malm%C3%B6%29
Juhan - "Webmaster", at your service...
He who asks a question is a fool for five minutes. He who does not ask a question remains a fool forever. [Old Chinese Proverb]
thanks 1 user liked this useful post by Webmaster
Offline Yumgui  
#12 Posted : 16 August 2013 22:38:19(UTC)
Yumgui

United States   
Joined: 20/03/2011(UTC)
Posts: 1,660
Location: Paris, France
Originally Posted by: Webmaster Go to Quoted Post
Quite interesting - the "City Tunnel" in Malmoe, Sweden, was finished both before the deadline and also below budget...

Swedes move faster than most, OK, because they spend more time at the pub ... ^^

Y Wink
If your M track is rusted ... DON'T throw it out !
Working on: https://studiogang.com/projects/all
My heavy train station renovation: https://youtu.be/QQlyNiq416A
Inspired by: http://www.nakedmarklin.com/... Am not alone in this universe, phew.
thanks 1 user liked this useful post by Yumgui
Offline DigitalNZ  
#13 Posted : 16 August 2013 22:38:52(UTC)
DigitalNZ

New Zealand   
Joined: 13/12/2011(UTC)
Posts: 233
Location: Masterton, New Zealand
Originally Posted by: petestra Go to Quoted Post
Mama Mia, what-a mistake-a to make-a ! Scared Thanks for the story,Tom.

Peter


thanks 2 users liked this useful post by DigitalNZ
Offline Western Pacific  
#14 Posted : 16 August 2013 23:39:28(UTC)
Western Pacific

Sweden   
Joined: 19/09/2009(UTC)
Posts: 841
Location: Lidingö, Sweden
Originally Posted by: Yumgui Go to Quoted Post
Originally Posted by: Webmaster Go to Quoted Post
Quite interesting - the "City Tunnel" in Malmoe, Sweden, was finished both before the deadline and also below budget...

Swedes move faster than most, OK, because they spend more time at the pub ... ^^

Y Wink


Not all tunnels in Sweden are on time or below budget. Hallandsås tunnel is a project which originally was planned to be ready in 1995. One of the two tunnels has been drilled - the other has a bit over 200 metres to go. (Perhaps some people spent too much time in a pub instead of studying geological studies etc. in this case).
thanks 3 users liked this useful post by Western Pacific
Offline petestra  
#15 Posted : 17 August 2013 00:00:09(UTC)
petestra

United States   
Joined: 27/07/2009(UTC)
Posts: 5,843
Location: Leesburg,VA.USA
Thanks Daniell, That's where I got that line from as you probably knew. I love

British comedies. Peter LOL
thanks 1 user liked this useful post by petestra
Offline Webmaster  
#16 Posted : 17 August 2013 00:14:43(UTC)
Webmaster


Joined: 25/07/2001(UTC)
Posts: 11,162
Originally Posted by: Western Pacific Go to Quoted Post
Not all tunnels in Sweden are on time or below budget. Hallandsås tunnel is a project which originally was planned to be ready in 1995. One of the two tunnels has been drilled - the other has a bit over 200 metres to go. (Perhaps some people spent too much time in a pub instead of studying geological studies etc. in this case).


This is a sad project indeed, instead of knowing the challenges - the procurators went for the cheapest option.... Those "business economists" again... Mad
They even tried to seal water leaks with Rhoca-Gil instead of having proper lining many years ago...

A very good example of how things can go wrong if you don't do your homework properly and let economists instead of engineers decide on what project offer to accept... Crying
Juhan - "Webmaster", at your service...
He who asks a question is a fool for five minutes. He who does not ask a question remains a fool forever. [Old Chinese Proverb]
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 0.880 seconds.