Joined: 12/08/2006(UTC) Posts: 9,277
|
ESU did verified new BR78 and T18 in difference era. Delivery Q3/2022! Klockankar motor with brass wheel Digital couples Under frame lighting Cab lighting Smoke generator with synchronized steam Smoke cylinder!!! Power cap Loksound 5 Metal body and under frame Flickering fire box Edited by user 02 July 2022 16:57:33(UTC)
| Reason: Not specified |
H0 DCC = Digital Command Control
|
 6 users liked this useful post by Goofy
|
|
|
Joined: 09/08/2008(UTC) Posts: 1,919 Location: Auckland,
|
Cool, thanks for the info Goofy 👍
|
|
|
|
Joined: 12/08/2006(UTC) Posts: 9,277
|
I did upgraded my first comment. Sorry for missed information. |
H0 DCC = Digital Command Control
|
|
|
|
Joined: 21/10/2004(UTC) Posts: 31,692 Location: United Kingdom
|
Thanks, Any link for download PDF? |
Large Marklinist 3- Rails Layout with CS2/MS2/Boosters/C-track/favorites Electric class E03/BR103, E18/E118, E94, Crocodiles/Steam BR01, BR03, BR05, BR23, BR44, BR50, Big Boy. |
|
|
|
Joined: 12/08/2006(UTC) Posts: 9,277
|
Originally Posted by: steventrain  Thanks, Any link for download PDF? Yes! Visit ESU and download T18. There is locomotive manual. |
H0 DCC = Digital Command Control
|
|
|
|
Joined: 21/10/2004(UTC) Posts: 31,692 Location: United Kingdom
|
Originally Posted by: Goofy  Originally Posted by: steventrain  Thanks, Any link for download PDF? Yes! Visit ESU and download T18. There is locomotive manual. I check ESU website but can not find download PDF. Can you show the PDF link? Thanks. |
Large Marklinist 3- Rails Layout with CS2/MS2/Boosters/C-track/favorites Electric class E03/BR103, E18/E118, E94, Crocodiles/Steam BR01, BR03, BR05, BR23, BR44, BR50, Big Boy. |
|
|
|
Joined: 04/08/2018(UTC) Posts: 1,157
|
Originally Posted by: steventrain  I check ESU website but can not find download PDF. Can you show the PDF link? Thanks. The German version can be found here : https://www.esu.eu/download/betriebsanleitungen/esu-engineering-edition/(you can translate it on this page:https://www.onlinedoctranslator.com/en/translationform) it's a nice and interesting locomotive. :) Thanks for the tip
|
 1 user liked this useful post by bph
|
|
|
Joined: 21/10/2004(UTC) Posts: 31,692 Location: United Kingdom
|
Originally Posted by: bph  Originally Posted by: steventrain  I check ESU website but can not find download PDF. Can you show the PDF link? Thanks. The German version can be found here : https://www.esu.eu/download/betriebsanleitungen/esu-engineering-edition/(you can translate it on this page:https://www.onlinedoctranslator.com/en/translationform) it's a nice and interesting locomotive. :) Thanks for the tip Great, Thanks. |
Large Marklinist 3- Rails Layout with CS2/MS2/Boosters/C-track/favorites Electric class E03/BR103, E18/E118, E94, Crocodiles/Steam BR01, BR03, BR05, BR23, BR44, BR50, Big Boy. |
 1 user liked this useful post by steventrain
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hello, video présentation here |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
 5 users liked this useful post by franciscohg
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Hello, video présentation here Fransico, Thanks for video- Super toll - Das ist wunderbar - Preussischer T18 mit dynamischem Rauch. kann es kaum erwarten 😜 Super -duper , That's wonderful - Prussian T18 with dynamic smoke. can't wait !!! Regards, Märklineisenbahn
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Already ordered....... |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
 2 users liked this useful post by franciscohg
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Already ordered....... Hi Francisco, Whom did you exactly ordered from ? I found it without European 19% VAT for € 487.00 Euros which is pretty good ( in comparison to late Märklin locomotives ) AC or DC. Regards, Märklineisenbahn
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hi, from Lippe, 478.15 eur Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
 1 user liked this useful post by franciscohg
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Hi, from Lippe, 478.15 eur Regards Hallo Francisco, Thanks for sharing this with rest of us. Already placed an order for KPEV T18 Respectfully, Märklineisenbahn P.S. How is Roco’s BR10 with dynamic smoke running?
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hi She is running fine......The problems were with the Merkur set, i have developped an addiction for those steel blue F-zuge And well, the delivery of the ESU T18 should begin next week, so i will be able to test it in a couple of weeks Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
|
|
|
Joined: 27/01/2005(UTC) Posts: 353 Location: Taipei,
|
Apparently. the functions that had been applied with 1 gauge model trains has respectively transferred to HO. ESU is a well-developed company dedicated to creative and innovative product which has been exceed to Marklin. I wonder what the next newly function will be on HO.  Edited by user 09 July 2022 09:57:41(UTC)
| Reason: Not specified
|
|
|
|
Joined: 12/08/2006(UTC) Posts: 9,277
|
Originally Posted by: franciscohg  Hi She is running fine......The problems were with the Merkur set, i have developped an addiction for those steel blue F-zuge And well, the delivery of the ESU T18 should begin next week, so i will be able to test it in a couple of weeks Regards Begin next week? Delivery are Q3/2022. In this case about three months before start delivery to first customer. |
H0 DCC = Digital Command Control
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Kw28 according Lippe social Media. When ordered last week, yellow dot with delivery from manofactur about 10-15 working days. Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Kw28 according Lippe social Media. When ordered last week, yellow dot with delivery from manofactur about 10-15 working days. Regards Hi Francisco, Dreileiters- he is right Lippe send email to all who ordered from first production batch! So … Francisco sit tight we should get this beautiful locomotive on “first come first serve” basis. … You may have to wait a bit longer ’cause ( as I remember) delivery to your location takes a long time. But I Will keep you posted when it comes in to East coast of US … 🤔🤫 Regards, Märklineisenbahn
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hi, Lippe send by Fedex, more expensive, but they do all the customs paperwork as any other courier, so, i usually get my parcels from them in about 7-10 days  The only thing received from them says that delivery would Beginn in KW28 Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
|
|
|
Joined: 12/08/2006(UTC) Posts: 9,277
|
No the information are wrong! ESU did verified delivery start at Q3/2022. That you did ordered doesn´t said if when delivery when it stand at yellow dot. It´s different between the saler and manufacturer. |
H0 DCC = Digital Command Control
|
|
|
|
Joined: 08/11/2005(UTC) Posts: 3,528 Location: Mullerup, 4200 Slagelse
|
Originally Posted by: Goofy  ESU did verified delivery start at Q3/2022. When do you think Q3/2022 starts? Per. |
If you can dream it, you can do it! I, the copyright holder of this work, hereby release it into the public domain. This applies worldwide. In case this is not legally possible: I grant anyone the right to use this work for any purpose, without any conditions, unless such conditions are required by law.  |
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Originally Posted by: Goofy  No the information are wrong! ESU did verified delivery start at Q3/2022. That you did ordered doesn´t said if when delivery when it stand at yellow dot. It´s different between the saler and manufacturer. Well, then the parcel that was shipped to me today must be filled with air... I will surely file a complain. Seriously, by the end of next week i will be able to test that loco!!!!!  |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
 4 users liked this useful post by franciscohg
|
|
|
Joined: 23/07/2014(UTC) Posts: 8,476 Location: ENGLAND, Didcot
|
|
 2 users liked this useful post by kiwiAlan
|
|
|
Joined: 08/11/2005(UTC) Posts: 3,528 Location: Mullerup, 4200 Slagelse
|
Originally Posted by: kiwiAlan 
I think Goofy is still back in June ...
Probably The big question is which year Per. |
If you can dream it, you can do it! I, the copyright holder of this work, hereby release it into the public domain. This applies worldwide. In case this is not legally possible: I grant anyone the right to use this work for any purpose, without any conditions, unless such conditions are required by law.  |
 1 user liked this useful post by Purellum
|
|
|
Joined: 04/08/2018(UTC) Posts: 1,157
|
a few videos have appeared on youtube. on the first one, the sound is a bit strange, possibly a faulty fan? otherwise, it seems to be a nice locomotive.
|
 5 users liked this useful post by bph
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Originally Posted by: Goofy  No the information are wrong! ESU did verified delivery start at Q3/2022. That you did ordered doesn´t said if when delivery when it stand at yellow dot. It´s different between the saler and manufacturer. Well, then the parcel that was shipped to me today must be filled with air... I will surely file a complain. Seriously, by the end of next week i will be able to test that loco!!!!!  Hi Francisco, As per email from Lippe mine was shipped today so given take 10-12 days should be at my doorstep. FeDEx claims Monday 18 of July - but I doubt it !!! Cheers, Märklineisenbahn
|
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hi At least in my case the estimated delivery of fedex is quite accurate, no more than 2 days of difference, once it arrives one day earlier. Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: franciscohg  Hi At least in my case the estimated delivery of fedex is quite accurate, no more than 2 days of difference, once it arrives one day earlier. Regards Hi Francisco As of this morning Eg. 07-14-22 parcel is already in US at JFK Jamaica sorting facility! So promised Monday delivery is doable 🤔😆 That would be record fast - even faster than Express from Germany by DHL Duh 🙄 ! Unpredicted outcome.. 🫡👍👍👍 Regards, Märklineisenbahn
|
|
|
|
Joined: 04/05/2015(UTC) Posts: 777 Location: England, London
|
So its “nice but dim” question time – sorry. I am a Marklin digital man of many years – CS3 and C track etc I have admired ESU loks quite often but never purchased I am getting very fudgy fingered so prefer things out of the box onto the track MFX programs instantly and of we go. But this item catches my eyes -it’s the steam sync I think. My perception of ESU loks is that you have to mess around fitting the slider for three rail and then I don’t know how you load it on a CS3 so the functions show and work. So tell me is it straight forward or a pain in the ass.
|
 1 user liked this useful post by Rwill
|
|
|
Joined: 10/02/2021(UTC) Posts: 3,898 Location: Michigan, Troy
|
|
 1 user liked this useful post by marklinist5999
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: Rwill  My perception of ESU loks is that you have to mess around fitting the slider for three rail and then I don’t know how you load it on a CS3 so the functions show and work. So tell me is it straight forward or a pain in the ass.
Hallo Rwill , Dreileiters, Good Day to all , I have no Idea where did you get that info! I have now 3 ESU and 4 th one is on the way [ one extra V200 I sold few yers back] so that makes me quite experienced with ESU brand. Br 215 Br 200 x 2 Br 78 ( T18 ) No pain in the rear end - Actually is other way around - locomotive comes with “Slider “ for Märklin AC and they provide tool to dislodge ( remove) slider for pure 2 rail DCC lovers! All ESU decoders are M4 [ which is Märklin MFX - ‘cause patent & royalties ] ESU can’t use name MFX - instead M4 ESU Locomotives are very smooth running and I did not experienced any problems on C-Track ( that’s is up to 2018/19 because after that I had to dismantle my layout and spend most of time battling uphill battle with cancer) Regards, Märklineisenbahn
|
 2 users liked this useful post by Marklineisenbahn
|
|
|
Joined: 12/08/2006(UTC) Posts: 9,277
|
That was fast to delivery BR78! ESU do often delivery theirs model late and i was supriced to see already out in the market. |
H0 DCC = Digital Command Control
|
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: Goofy  That was fast to delivery BR78! ESU do often delivery theirs model late and i was supriced to see already out in the market. Hallo Dreileiters, Francisco, ESU T18 31182 is here in Record time of 48 hours From Detmold Germany to NYC US !!! That impressive delivery time and cost efficient- faster than DHL Express which costs 3 times higher. Will test this beautiful locomotive over the weekend. Respectfully, Märklineisenbahn
|
 3 users liked this useful post by Marklineisenbahn
|
|
|
Joined: 14/05/2011(UTC) Posts: 311 Location: New York City
|
Originally Posted by: Goofy  That was fast to delivery BR78! ESU do often delivery theirs model late and i was supriced to see already out in the market. Hi Goofy, Yes indeed it was Super Fast - HAMMER!!!  And locomotive is beautiful indeed, can’t wait to put her on the rollers and start testing! Respectfully, Märklineisenbahn
|
 3 users liked this useful post by Marklineisenbahn
|
|
|
Joined: 10/07/2002(UTC) Posts: 3,298 Location: Patagonia
|
Hello, got mine today, will test tomorrow since i am at work today, but it looks and feels just great. Regards |
 German trains era I-II and selected III, era depends on the mood, mostly Maerklin but i can be heretic if needed XD, heresy is no longer an issue.. LOL |
|
|
|
Joined: 23/07/2014(UTC) Posts: 8,476 Location: ENGLAND, Didcot
|
Originally Posted by: franciscohg  Hello, got mine today, will test tomorrow since i am at work today, but it looks and feels just great. Regards Well, that is real good service from Europe to the far south.
|
 1 user liked this useful post by kiwiAlan
|
|
|
Forum Jump
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.