marklin-users.net community
| Forum
Welcome to the forum
Home
Community Forum
Welcome Guest! To enable all features please
Login
or
Register
.
Forum
Active Topics
Login
Register
Notification
Error
OK
marklin-users.net community | Forum
»
General topics
»
Great layouts I have seen...
»
Backo Mini Express
6 Pages
<
1
2
3
4
>
»
Go to Page...
Backo Mini Express
Share
Email this topic
LinkBack Topic URL
Retweet this Topic
Share Topic on Google+
Like this Topic
Share on Facebook
Digg this Topic
Reddit this Topic
Share on Tumblr
Options
Watch this topic
Print this topic
View
» Normal
Threaded
Previous Topic
Next Topic
Minok
#51
Posted :
16 March 2017 18:38:36(UTC)
Retweet
Joined: 15/10/2006(UTC)
Posts: 2,313
Location: Washington, Pacific Northwest
Well, the view of the locomotive maintenance work area was interesting while it lasted. Tools, grease and dirt, loco parts, coffee/tea, lots of clutter. I'm sure like many of our work tables.
Toys of tin and wood rule!
---
My Layout Thread on
marklin-users.net:
InterCity 1-3-4
My YouTube Channel:
https://youtube.com/@intercity134
1 user liked this useful post by Minok
grnwtrs
User Profile
View All Posts by User
View Thanks
1borna
#52
Posted :
16 March 2017 20:45:50(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I will repeat once again post on maintenance without mentioning friend who is working on it
A layout is constantly over 100 locomotives (up to 150) and around 1,000 wagons. Program management (Win-Digiped) measured while driving each locomotive and when assembled 40 hours warning that it is time for service.
Always has and contingencies with failures so that the desk too expensive and models
When the wagon is lubricated axle and possibly changing buckles and installed lighting (for those who do not)
Installation example of miniature LED lights to table lamps wagon restaurants
Additionally placed small figures of passengers
Video of installing lights in the coach:
https://www.youtube.com/watch?v=bJgl8p8auu4&t=258s
On the smaller layouts that times go months and years until expensive 40 hours of driving on such a large layout of daily work and lots of stripes (over 1, ooo meters) locomotives device schedule in 3-4 weeks!
BLOG
7 users liked this useful post by 1borna
petestra
,
grnwtrs
,
Danlake
,
xxup
,
ONR
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#53
Posted :
23 March 2017 20:48:16(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
They are elements of the road on a large layout which will have a length of about 300 meters
Each item will have its own power supply for wireless transmission because it is impossible to make such a big circle
Each part must have the same frequency and should be brought into line capacitors
Built for the trial and the part where the trucks themselves to enter the carriages
The composition will be with more wagons and trucks will go alone to the last free space
https://www.youtube.com/watch?v=jS7ffxyIeBk
This is already half finished part which will go to the layout
Micro switch at the end of the ramp stops train
BLOG
6 users liked this useful post by 1borna
petestra
,
grnwtrs
,
Danlake
,
xxup
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#54
Posted :
31 March 2017 20:41:40(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Details on vehicle wireless operation
Sockets for direct supply and programming of the decoder
It is a new layout for road transport
Dude has over 15 years and has experienced numerous changes and additions
Removes all of which can still be used
The new layout assigned to a wireless power
BLOG
7 users liked this useful post by 1borna
petestra
,
grnwtrs
,
dominator
,
Danlake
,
xxup
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#55
Posted :
09 April 2017 21:10:08(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
After laying the wire leading etched channels are sealed with a plaster cast that sharpens
The ramp for loading a truck on the train is fitted to the layout
Preparation is another element with floating details- on the dance floor will be spinning little dancers
On the layout will be next to the top station of the cable car
BLOG
9 users liked this useful post by 1borna
Minok
,
petestra
,
grnwtrs
,
dominator
,
Danlake
,
xxup
,
TrainIride
,
Gregor
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#56
Posted :
17 April 2017 21:01:57(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Recently, I went up to the working platform above the left side of the layout
BLOG
9 users liked this useful post by 1borna
Minok
,
petestra
,
grnwtrs
,
dominator
,
Danlake
,
xxup
,
TrainIride
,
Gregor
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#57
Posted :
26 April 2017 20:28:02(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I'll be back in the past on the pictures I skiped for newer events
The layout tunnel has a lot to do and they are different
The elaborate details are in every part of the layout
BLOG
11 users liked this useful post by 1borna
Minok
,
RayF
,
CanadianKid
,
petestra
,
grnwtrs
,
dominator
,
Danlake
,
xxup
,
TrainIride
,
Gregor
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#58
Posted :
08 May 2017 19:47:47(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
10 users liked this useful post by 1borna
RayF
,
CanadianKid
,
petestra
,
grnwtrs
,
dominator
,
Danlake
,
xxup
,
TrainIride
,
Gregor
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#59
Posted :
16 May 2017 21:32:54(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I used the opportunity when the middle layout was empty so I jumped from below to shoot from the middle
BLOG
10 users liked this useful post by 1borna
MalinAC
,
grnwtrs
,
dominator
,
Gregor
,
petestra
,
RayF
,
Danlake
,
xxup
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#60
Posted :
26 May 2017 20:35:59(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
10 users liked this useful post by 1borna
Minok
,
PJMärklin
,
dominator
,
Gregor
,
petestra
,
RayF
,
Danlake
,
xxup
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#61
Posted :
05 June 2017 20:19:44(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
6 users liked this useful post by 1borna
RayF
,
Danlake
,
xxup
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#62
Posted :
14 June 2017 20:24:11(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
6 users liked this useful post by 1borna
RayF
,
Danlake
,
xxup
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
Danlake
#63
Posted :
15 June 2017 12:53:48(UTC)
Retweet
Joined: 03/08/2011(UTC)
Posts: 1,571
Thanks Lborna,
It's such a fantastic layout and truly enjoy following this.
Should I ever visit the region I would be on my list to visit
Brgds Lasse
Digital 11m2 layout / C (M&K) tracks / Era IV / CS3 60226 / Train Controller Gold 9 with 4D sound. Mainly Danish and German Locomotives.
User Profile
View All Posts by User
View Thanks
1borna
#64
Posted :
15 June 2017 20:21:35(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Thank you, I hope you will come at least once! Layout also has its own website-
http://www.backo.hr/
BLOG
User Profile
View All Posts by User
View Thanks
1borna
#65
Posted :
23 June 2017 21:42:12(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
This is how layout works look like this
Below it is easier
It's about bridging
There will be much work around the relief here
BLOG
6 users liked this useful post by 1borna
xxup
,
dennisb
,
dominator
,
TrainIride
,
Gregor
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#66
Posted :
04 July 2017 19:54:55(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
4 users liked this useful post by 1borna
xxup
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#67
Posted :
13 July 2017 20:45:34(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The left part of the layout is sanded with snow
It is plastered and soaked with a woodfix solution and eventually small beads are sprinkled
I fell in the helix on the left (this is not for the fuller people)
Then it could still be seen out there, later it was closed
BLOG
6 users liked this useful post by 1borna
Alsterstreek
,
Minok
,
xxup
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#68
Posted :
22 July 2017 20:58:38(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Longer working in a lying position on the platform can be tedious
I climbed to a tall ladder to shoot from above
Hidden cells under the ceiling
BLOG
9 users liked this useful post by 1borna
xxup
,
MalinAC
,
dennisb
,
Alsterstreek
,
dominator
,
Best Ripper
,
Danlake
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
MalinAC
#69
Posted :
23 July 2017 08:28:42(UTC)
Retweet
Joined: 29/05/2014(UTC)
Posts: 839
Location: DONEGAL, CARNDONAGH
I hope your getting danger pay working like that. It looks fantastic.Eddie
1 user liked this useful post by MalinAC
1borna
User Profile
View All Posts by User
View Thanks
1borna
#70
Posted :
23 July 2017 20:59:10(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Thanks, so nice comments are the inspiration for me to paint and write on!
BLOG
User Profile
View All Posts by User
View Thanks
1borna
#71
Posted :
30 July 2017 20:48:03(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Arrangement of relief on the left part of the layout
The thin layer of earth is applied
The trees are prepared for installation
BLOG
4 users liked this useful post by 1borna
Danlake
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#72
Posted :
06 August 2017 21:50:15(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
After the preparation of the terrain, trees and plums were planted
She also has a job for two
BLOG
6 users liked this useful post by 1borna
MalinAC
,
petestra
,
Danlake
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#73
Posted :
13 August 2017 21:05:44(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Something's working in the basement
The fence gets painted
Later, later on, it lands in the intended place
Above the tunnel
BLOG
4 users liked this useful post by 1borna
Danlake
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#74
Posted :
21 August 2017 21:17:12(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
A little look at what lies behind and below the mountain
According to the main station
One ruin is ready for installation on the layout
I shot all the old photos so I'm going back to this year where I stopped
The small layout for road traffic has got its underground wireless power
Sensors are placed on the surface and the surface of the road is smooth
New road routes for the big layout are being created in the workshop
BLOG
4 users liked this useful post by 1borna
Danlake
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#75
Posted :
28 August 2017 21:36:59(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The small road layout got a semaphore at the crossroads
And works on long roads for big layout are advancing (more than 300 meters of roads with wireless power should be made)
There are always interesting models on the service desk
On the left side of the layout, fly 2 paragliders
BLOG
4 users liked this useful post by 1borna
Minok
,
dominator
,
TrainIride
,
GlennM
User Profile
View All Posts by User
View Thanks
Minok
#76
Posted :
28 August 2017 22:04:26(UTC)
Retweet
Joined: 15/10/2006(UTC)
Posts: 2,313
Location: Washington, Pacific Northwest
I'm really intrigued by the wireless power solution for the DCCar system.. is/will the way that solution works be published in some form? IE with what controllers the under-road conductors are powered, how to wind the under-vehicle pickups, etc?
I'd be interested in experimenting with that for my home layout (rather than batteries).
Toys of tin and wood rule!
---
My Layout Thread on
marklin-users.net:
InterCity 1-3-4
My YouTube Channel:
https://youtube.com/@intercity134
User Profile
View All Posts by User
View Thanks
1borna
#77
Posted :
29 August 2017 19:45:36(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
For more detailed information, contact the owner of the layout at
antun.urbic@data-link.hr
BLOG
1 user liked this useful post by 1borna
Minok
User Profile
View All Posts by User
View Thanks
1borna
#78
Posted :
07 September 2017 20:53:39(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Editing of basement rooms to extend layouts has begun (the line will be lowered down and continued on new sections)
It looks terrible but first all the old installations have to be removed
More detail from a large layout
BLOG
4 users liked this useful post by 1borna
dominator
,
TrainIride
,
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#79
Posted :
15 September 2017 20:14:53(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The small layout for trains learning has got grass
The grass is of different colors and lengths
All the trains for the whole train are being prepared in the workshop
Long section sections with wireless power for large layout work
New layout time (something shortened)
from 18.9. Mon.-Fri. From 14am to 6pm Saturday from 10am to 6pm Sundays closed.
So to Advent when working hours are 13-21 hours Saturday and Sunday 10-21 hours.
BLOG
5 users liked this useful post by 1borna
TrainIride
,
Best Ripper
,
petestra
,
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#80
Posted :
23 September 2017 21:06:01(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The furnishing of the basement rooms started with the installation of new electricity intensions
Nice weather also increased the visit
The competition for the selection of the most beautiful locomotives was also created
Kids are thrilled to drive the trains themselves
I have slightly rebuilt the showcases with various locomotives
Trial trips on road freight route began
BLOG
3 users liked this useful post by 1borna
petestra
,
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
ocram63_uk
#81
Posted :
29 September 2017 09:59:38(UTC)
Retweet
Joined: 07/01/2015(UTC)
Posts: 708
Location: England, Suffolk
I was in Zagreb for work wednesday and after I got back to the hotel tuesday evenig I googled for "Marklin shops in Zagreb" and the site of this layout came up as a result. After I finished my meeting I asked the taxi driver to take me to this address, in the center of town too.
I entered the place where the layout is and I discovered that the layout is undergoing a big maintenance schedule.
No trains runnning as of today, lots of works in progress but nonetheless the person I spoke with for an hour was very kind and avaiable to describe the technology behind it.
The layout had a Faller system for cars that they are now going to replace, they will be using cars powered by an induction system, so no more battries on board of cars, trucks and the lot.
I asked him what they thought of the Marklin's electrical motors for switches and he told me that to have reliability they had to "invent" something else and he showed me the new motors.
Mainly the base is made of perspex where they have cut out the room for a small servo, like the ones used on model airplanes, it is shaped so that it can fit under the board and they do not have to dig up the whole section if it should ever fail. I thought it was a work of genius.
Anyway the layout should be open with trains runnig before Christmas, so he told me.
If you are in the city and want to go and have an interesting chat it is worthwhile, plus Zagreb' city center is very nice.
I did not visit the adiacent shop as I did not want to spend any money, yet.
Ciao
Marco
2 users liked this useful post by ocram63_uk
1borna
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#82
Posted :
29 September 2017 20:46:35(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Thank you for visiting, I hope that your next one will be in operation!
The basement rooms now look far better
The Little Marklin layout has also advanced
BLOG
2 users liked this useful post by 1borna
petestra
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#83
Posted :
13 October 2017 20:09:44(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
There's still plenty to do in the city
Tunnels are made for road traffic
They have signaling, lighting and ventilation as real!
Another city is being prepared
A couple of pictures of what's hidden behind the mountains
There is nothing new on the Desk for repair and repairs (it's always a lot)
I've changed some of my showcase models
BLOG
3 users liked this useful post by 1borna
PJMärklin
,
petestra
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#84
Posted :
20 October 2017 20:53:43(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The elevator for the whole train composition is in the test drive
Electronics are provisionally complex
The length is 3 meters and the height of the lift is 90 cm
The drive is currently very loud but when everything is over it will be quiet
During the summer she is quiet at the store
While there is a lot of work on the work desk
BLOG
5 users liked this useful post by 1borna
Alsterstreek
,
PJMärklin
,
petestra
,
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#85
Posted :
27 October 2017 20:31:08(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
In the summer, visitors were mostly tourists from all over the world, some stayed the whole day!
Group of tourists from India, enthusiasts of the railroad, which travels around the world and visit model railways, were in Zagreb with only one goal – to visit Backo Mini Express in Zagreb at Gundulićeva 4. In fact, located at this address since 2015. is the largest scale model railway in the Southeast Europe. Since its opening until today, it never ceases to attract the attention of visitors of all ages and nations.
This is particularly felt during the summer, when there are many tourists in Zagreb, of which a large part comes to visit Backo Mini Express. Global interest in this little oasis of great creativity and manual labor, was registered this summer by tourists from around the world. Among them were tourists from India who found news about the largest scale model of the South-East Europe on the internet and decided to visit it this summer.
Guests from India, as they admitted it themselves, came to Zagreb just for our model. When they arrived, they stayed with our trains for three hours. Almost everything in our area interested them, and they pointed out that they are travelling the world visiting model railways like ours. However, the Croatian model, as they say, is the most beautiful they had ever seen – said Antun Urbić Backo, creator and owner of the largest scale model project of the South-East Europe.
As the development of models Backo Mini Express continues, already this autumn, visitors can expect numerous innovations, and Indian tourists announced that they are surely comming to Zagreb again to see what was added in the meantime.
A truck loading / unloading ramp was installed
The basements of the rooms are almost finished
BLOG
2 users liked this useful post by 1borna
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#86
Posted :
03 November 2017 21:20:30(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The workshops run long distance routes with wireless power
It was also a small layout for road vehicles, infra-red management via special lights on pillars
The dump truck ramp is built into the left part of the layout
I did not resist not to photograph some details again from another angle or zoom
BLOG
2 users liked this useful post by 1borna
grnwtrs
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#87
Posted :
13 November 2017 19:38:10(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
There are new roads everywhere
even on the service desk
The top hidden cell is full
Now it's better to work in the basement
Someone's still hot
There is also a tram in preparation
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#88
Posted :
19 November 2017 19:44:16(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
The square of King Tomislav with a skating rink is being renewed
As in reality, there will be a tram station in front of it
The cam rope ramp was painted
The cellar has been removed to be able to record a film about a truck junction
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#89
Posted :
26 November 2017 20:16:52(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
At the main station, trucks will enter the wagons
In order to set up new roads, much is open on the layout
In the new room there will be temporarily located the Art Pavilion with a skating rink, a tram station and a train station
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#90
Posted :
06 December 2017 21:08:11(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I will skip some of the less important images (to which I will come back later) to come to the present day
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#91
Posted :
06 December 2017 21:17:07(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
BLOG
2 users liked this useful post by 1borna
Minok
,
GlennM
User Profile
View All Posts by User
View Thanks
Minok
#92
Posted :
06 December 2017 22:47:19(UTC)
Retweet
Joined: 15/10/2006(UTC)
Posts: 2,313
Location: Washington, Pacific Northwest
Originally Posted by: 1borna
Do you know, is this the Tilig Luna tram track system?
Toys of tin and wood rule!
---
My Layout Thread on
marklin-users.net:
InterCity 1-3-4
My YouTube Channel:
https://youtube.com/@intercity134
User Profile
View All Posts by User
View Thanks
1borna
#93
Posted :
07 December 2017 09:26:15(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Right, that's Tillig
Trams (and other vehicles in the picture) were made (or processed) by Dražen Bijelić from Zagreb
BLOG
2 users liked this useful post by 1borna
Minok
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#94
Posted :
09 December 2017 20:52:05(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
King Tomislav Square and the train station in Zagreb these days
More pictures are on the link
https://www.jutarnji.hr/life/adv...ventsko-vrijeme/6822489/
BLOG
2 users liked this useful post by 1borna
petestra
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#95
Posted :
16 December 2017 21:54:41(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I'll go back a little bit, the space for Advent is squished
The finishing works of some parts are performed in the basement
It is built-in lighting at one station
The building is not yet complete
One park was also built
BLOG
2 users liked this useful post by 1borna
MalinAC
,
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#96
Posted :
22 December 2017 20:47:41(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Behind the Main Station are preparing numerous roads that will pass through the city
Parts of the city and roads are being completed in the basement
The descent into the basement is a bit decorated
Firefighters will fire here for intervention
The pines on Tomislavov Square received jewelry
Entrance to the underpass below the station
There are numerous kiosks on the tram stop
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
1borna
#97
Posted :
11 January 2018 21:04:22(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
I shot the square in the nightmare
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
kiwiAlan
#98
Posted :
11 January 2018 22:44:37(UTC)
Retweet
Joined: 23/07/2014(UTC)
Posts: 8,267
Location: ENGLAND, Didcot
Originally Posted by: 1borna
I shot the square in the nightmare
Umm, I think you mean night time rather than nightmare
A nightmare is a bad dream often causing you to wake up
1 user liked this useful post by kiwiAlan
Minok
User Profile
View All Posts by User
View Thanks
1borna
#99
Posted :
15 January 2018 21:07:54(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
Thank you for your correction, as I'm not very skilled in English, I use Google translate that sometimes plays
BLOG
User Profile
View All Posts by User
View Thanks
1borna
#100
Posted :
28 January 2018 21:42:30(UTC)
Retweet
Joined: 21/12/2012(UTC)
Views messages in topic : 1,424
Location: Hrvatska
On a large layout, a beautiful park was temporarily created to fill the empty place
where one day the city will come with a lot of roads
It is still to be filled with figurines of people and children
I photographed a few more trams by Dražen Bijelić from Zagreb (who are also driving the right trams)
About his huge and valuable collections of trams of all kinds I will talk at another occasion and in another place
BLOG
1 user liked this useful post by 1borna
GlennM
User Profile
View All Posts by User
View Thanks
Users browsing this topic
OceanSpiders 2.0
6 Pages
<
1
2
3
4
>
»
Go to Page...
marklin-users.net community | Forum
»
General topics
»
Great layouts I have seen...
»
Backo Mini Express
Forum Jump
marklin-users.net community | Forum
General topics
- General MRR
- H0-scale
- Small scale
- Big scale
- Prototype
--- Videos
----- Steam
----- Electric
----- Diesel
----- Training and Instructional
----- Accidents
- Digital
- Model railroad software
- Model railroad photography
- Great layouts I have seen...
- News from Märklin and others
- Events, forum member meets, exhibitions & TV shows
Your layout, your trains and more....
- The Public Gallery by our members
Reviews
- Loco Reviews
- Reviews of rolling stock
- Accessories reviews
- Model kit reviews
- Digital components and Software reviews
Collector's Corner
- Collector's Corner general
- Märklin Sprint
- Construction kits
- Steam engines
- Tinplate toys
- Faller collectibles and other vintage accessories
The Projects & Workshop area
- Track plans
- Painting & Weathering
- Model railroad wiring
- Model kits & layout details, kitbashing and such
The Club Corner
- Model railroad & related club area - general
You
cannot
post new topics in this forum.
You
cannot
reply to topics in this forum.
You
cannot
delete your posts in this forum.
You
cannot
edit your posts in this forum.
You
cannot
create polls in this forum.
You
cannot
vote in polls in this forum.
|
Powered by YAF.NET
|
YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 4.227 seconds.