A freight train has apparently derailed in the Gotthard Base Tunnel. There is significant damage to the train and to the tunnel infrastructure.
Some traffic is being rerouted via the so-called "Panoramic" route (the old tunnel). Some traffic (eg Double Deck Trains) cannot travel on the classic route.
I was trying to figure out whether the second bore of the GBT can be used for traffic or whether it is closed in both directions.

https://www.20min.ch/sto...ren-die-sbb-480397510830

Regards

Mike C
thanks 1 user liked this useful post by mike c
Offline Bill L  
#2 Posted : 11 August 2023 19:52:23(UTC)
Bill L

United States   
Joined: 08/12/2021(UTC)
Posts: 88
Location: California, Sonoma County
Interesting that Double Deck Trains cannot handle the old classic scenic route with tunnels. Is it because these double deckers are too high and will hit the top of the entrance of the tunnels? I doubt the length would be a problem, unless they are too long and the edges would hit the side of the tunnels in the curves.
thanks 1 user liked this useful post by Bill L
Offline marklinist5999  
#3 Posted : 11 August 2023 23:37:46(UTC)
marklinist5999

United States   
Joined: 10/02/2021(UTC)
Posts: 3,159
Location: Michigan, Troy
Or the old route catenary would touch the roofs on the cars.
Offline mike c  
#4 Posted : 12 August 2023 18:47:46(UTC)
mike c

Canada   
Joined: 28/11/2007(UTC)
Posts: 7,904
Location: Montreal, QC
I know that on the stretch between Spiez and Interlaken, the trackbed in a few tunnels had to be lowered (excavated) in order to accommodate the trains in 1996.
As these trains were not used on the north-south Gotthard, there was no need to do this. The Base Tunnel allowed these trains to use this route for the first time when it opened.

Regards

Mike C
thanks 2 users liked this useful post by mike c
Offline jcrtrains  
#5 Posted : 17 August 2023 14:06:34(UTC)
jcrtrains

Canada   
Joined: 31/10/2009(UTC)
Posts: 597
Location: Toronto, Ontario
A long repair job

Gotthard tunnel update
thanks 1 user liked this useful post by jcrtrains
Offline marklinist5999  
#6 Posted : 17 August 2023 14:11:16(UTC)
marklinist5999

United States   
Joined: 10/02/2021(UTC)
Posts: 3,159
Location: Michigan, Troy
What a mess! At least the old route is plan B. The expressway pass is open until October too.
Offline Bill L  
#7 Posted : 18 August 2023 06:57:14(UTC)
Bill L

United States   
Joined: 08/12/2021(UTC)
Posts: 88
Location: California, Sonoma County
If I lived close by, I would get the camera out and visit the hbfs at Goschenen, Airolo etc. I have seen a lot of train videos on YouTube and that area is beautiful. Don't forget the church at Wassen too. You will not have another chance to see all those beautiful freight cars and passenger cars go by these area.
thanks 2 users liked this useful post by Bill L
Offline mike c  
#8 Posted : 18 August 2023 18:05:04(UTC)
mike c

Canada   
Joined: 28/11/2007(UTC)
Posts: 7,904
Location: Montreal, QC
There are a number of photos (railpictures.net/etc) of traffic re-routed on the old route. I have also seen YouTube videos from Wassen/Goeschenen and other locations on the mountain route.

The Giruno in active service on the old route is a nice sight.

https://www.railpictures.net/photo/838642/
https://www.railpictures.net/photo/838648/

I wonder what the passenger preference will be, the speed of the base tunnel or the views from the original route.
I did the tunnel in 2019, but prefer the scenic route. Somebody who travels to Italy regularly might prefer the time saved via the tunnel.

Regards

Mike C
thanks 2 users liked this useful post by mike c
Offline mike c  
#9 Posted : 25 August 2023 00:28:52(UTC)
mike c

Canada   
Joined: 28/11/2007(UTC)
Posts: 7,904
Location: Montreal, QC
I read that they have resumed operation of goods trains using the southbound bore this week. I do not know if this also applies to the RABe 502 double deck trainsets that had been running on some routes. I wonder whether clients have expressed a preference for the old route with the views over a quicker ride through the tunnel. I know that scenery is more interesting than the tunnel to me.

Regards

Mike C
thanks 2 users liked this useful post by mike c
Offline jcrtrains  
#10 Posted : 02 November 2023 19:33:45(UTC)
jcrtrains

Canada   
Joined: 31/10/2009(UTC)
Posts: 597
Location: Toronto, Ontario
Update on the tunnel repairs - much longer than anticipated.

Gotthard Tunnel update
thanks 3 users liked this useful post by jcrtrains
Offline marklinist5999  
#11 Posted : 03 November 2023 11:51:16(UTC)
marklinist5999

United States   
Joined: 10/02/2021(UTC)
Posts: 3,159
Location: Michigan, Troy
We'll see in September then!
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 0.361 seconds.