Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Offline mrunix  
#1 Posted : 29 April 2022 21:43:19(UTC)
mrunix

Sweden   
Joined: 18/02/2022(UTC)
Posts: 24
Location: Uppsala lan, Uppsala
Hello

I find it hard using the documents to see how the physical connection of a cables to the SwitchPilot 3 is done.

Is it using screws or some special connector?
Offline JohnjeanB  
#2 Posted : 30 April 2022 12:03:38(UTC)
JohnjeanB

France   
Joined: 04/02/2011(UTC)
Posts: 3,115
Location: Paris, France
Hi
The user's manual can be downloaded here
00221-24443_SwitchPilot3_SP3_51830_ESUKG_EN_Betriebsanleitung_Auflage-2_eBook.pdf (2,552kb) downloaded 23 time(s).

On page 5 it says "The SwitchPilot 3 is supplied with 5 detachable terminal blocks (1x
4-pole for the track connection, 4x 5-pole for the outputs) as well
as this operating manual. Under part number 51800.SP.01 a pack
of replacement terminal blocks is available from ESU.3
The detachable terminal are screw terminals

On page 11 power connection is shown
On page 12, Switch / signal / Lamps / LEDs is shown
I hope this helps
Cheers
Jean
Offline mrunix  
#3 Posted : 30 April 2022 12:17:35(UTC)
mrunix

Sweden   
Joined: 18/02/2022(UTC)
Posts: 24
Location: Uppsala lan, Uppsala

How come I missed that, my wife is mayby correct when she says I am blind :)

Thanks alot Jean


Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 0.319 seconds.