Hi
I live in Norway and are starting up again with this hobby.
I got my first train when I was a kid and it was stored under my bed on a frame with wheels so I could pull it out easily.
Then as an young adult I did buy an Mini Club system, but did never build a stable system and the tracks broke after some assembly and dissasembly. I was planing to do some more but kids took all the space and time.
Now everything is changing.
I am building a box with three parts. The middle frame is containing the tracks on topside and all electronics on the underside. The bottom layer can be used for storage of trains and hinged in the back with the middle frame. The top frame can be lifted off and is for protecting when stored in my closet.
I use AnyRail for planning and the picture as of today is just a result of training on using the program. I plan to have the two tracks following the frame as seen to day but I do not know how the middle will look later in the process.
I have an Digitrax DCS52 Zephyr Express on the way together with several different decoders and trains as a start.
First goal is to complete the build of the box. It is wood ready now and i wait for wheels, some metalparts and hinges.
Next step is to use dubbel sided tape and set up an small test track to learn more about DCC, reverse loop, blockdetection, JMRI and computer automation before going full out with an permanent layout.
As you can understand this is a long term project and the most important here right now is to get the box ready.
I do this project as an automation project and have no idea about what to build in terms of buildings and other model stuff... I think that will come later. I plan for building the tracks in one level to get as stable system at possible but will raise them up sligtly to get the possibility to build better looking layout with details later on. I have 90 mm from the base plate and up with 70mm where the two spars going under the frame so it is possible to build some kind of bridge there if i want and do it right.
Feel free to comment and ask.
This is an early attempt to create an crowded layout with lots of blockdetections zones.

Bits and pieces for the frames. It is really built from scratch

Three frames ready for some hardware

Bottom frame is, yea, the bottom frame... To protect the inside of middle frame.

The middle frame will be crowded with wiring and electronic and hinged to the bottom frame.

As an start i will just use dubbelsided tape to make an small test layout.

All three frames together whithout the hardware in place.

The finished box have an perfect spot waiting in my closet.
