Welcome to the forum   
Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Share
Options
View
Go to last post in this topic Go to first unread post in this topic
Online kiwiAlan  
#1 Posted : 04 May 2019 20:23:35(UTC)
kiwiAlan

United Kingdom   
Joined: 23/07/2014(UTC)
Posts: 8,101
Location: ENGLAND, Didcot
I haven't seen this link put up here yet, but it was recently on the Bar and Grill mail forum.

How an ICE 4 is built ... a camera team follows the build process for a German childrens TV program. It is four parts, each around 13 minutes long.

Part 1 is building a coach body.
Part 2 is fitting out the inside of a coach body.
Part 3 is building the bogies (very abbreviated) and fitting a control cab.
Part 4 is assembling a whole train and running it around a test track that is remarkably like a start set oval - and includes a rather fancy system to get a train across the test track without having a diamond crossing in it so it doesn't upset the high speed running on the test track.

Worth setting aside an hour to watch all the parts in one hit. It also emphasises how parts are shifted from one place to another around the EU before an item is completed.

thanks 6 users liked this useful post by kiwiAlan
Offline TEEWolf  
#2 Posted : 05 May 2019 21:31:39(UTC)
TEEWolf


Joined: 01/06/2016(UTC)
Posts: 2,465
Originally Posted by: kiwiAlan Go to Quoted Post
I haven't seen this link put up here yet, but it was recently on the Bar and Grill mail forum.

How an ICE 4 is built ... a camera team follows the build process for a German childrens TV program. It is four parts, each around 13 minutes long.

Part 1 is building a coach body.
Part 2 is fitting out the inside of a coach body.
Part 3 is building the bogies (very abbreviated) and fitting a control cab.
Part 4 is assembling a whole train and running it around a test track that is remarkably like a start set oval - and includes a rather fancy system to get a train across the test track without having a diamond crossing in it so it doesn't upset the high speed running on the test track.

Worth setting aside an hour to watch all the parts in one hit. It also emphasises how parts are shifted from one place to another around the EU before an item is completed.



Amazing which television lot Alan is lookingSmile, but sometimes it can be very interesting, as you see here.BigGrin

Here are the videos for everybody splitted into the 4 parts by direct access. All of them are in German, of course. It is made by the German public television company WDR for its children channel KIKA (= KInder-KAnal). The broadcasting is named "Sendung mit der Maus" ("Broadcast with the mouse"). While these broadcast are made for kids, there are plenty of explanations in German beside these pictures.

Aahh - caution @bigdaddyNZ with your mouse cables!Wink Laugh


Quote:
Part 1 is building a coach body.


https://kinder.wdr.de/tv...hte-ice---teil--100.html


Quote:
Part 2 is fitting out the inside of a coach body.


https://kinder.wdr.de/tv...hte-ice---teil--102.html


Quote:
Part 3 is building the bogies (very abbreviated) and fitting a control cab.


https://kinder.wdr.de/tv...te-ice----teil--100.html


Quote:
Part 4 is assembling a whole train and running it around a test track


https://www.wdrmaus.de/f...chichten/ice4_teil4.php5


As a bonus a video about the maintenance of an ICE

https://www.wdrmaus.de/f...hichten/ice_wartung.php5




thanks 2 users liked this useful post by TEEWolf
Online kiwiAlan  
#3 Posted : 05 May 2019 23:13:56(UTC)
kiwiAlan

United Kingdom   
Joined: 23/07/2014(UTC)
Posts: 8,101
Location: ENGLAND, Didcot
Originally Posted by: TEEWolf Go to Quoted Post
The broadcasting is named "Sendung mit der Maus" ("Broadcast with the mouse"). While these broadcast are made for kids, there are plenty of explanations in German beside these pictures.



Ah, so that explains the mouse picture on the coach at one point. Thanks for the explanation and background info.
thanks 1 user liked this useful post by kiwiAlan
Offline DaleSchultz  
#4 Posted : 06 May 2019 03:10:06(UTC)
DaleSchultz

United States   
Joined: 10/02/2006(UTC)
Posts: 3,997
Amazingly informative program for children. Impressive.


Dale
Intellibox + own software, K-Track
My current layout: https://cabin-layout.mixmox.com
Arrival and Departure signs: https://remotesign.mixmox.com
Offline klarinettmeister  
#5 Posted : 06 May 2019 14:41:48(UTC)
klarinettmeister

Sweden   
Joined: 13/02/2008(UTC)
Posts: 798
Location: Kirseberg
Quite interesting program. 😀

I started with the first program yesterday.
Offline Minok  
#6 Posted : 06 May 2019 20:47:09(UTC)
Minok

United States   
Joined: 15/10/2006(UTC)
Posts: 2,310
Location: Washington, Pacific Northwest
Nice. I came across the fully 1 hr assembled version this weekend myself:

Toys of tin and wood rule!
---
My Layout Thread on marklin-users.net: InterCity 1-3-4
My YouTube Channel:
https://youtube.com/@intercity134
thanks 3 users liked this useful post by Minok
Users browsing this topic
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

| Powered by YAF.NET | YAF.NET © 2003-2024, Yet Another Forum.NET
This page was generated in 0.328 seconds.